当前位置: X-MOL 学术Build. Res. Inf. › 论文详情
Our official English website, www.x-mol.net, welcomes your feedback! (Note: you will need to create a separate account there.)
Factors influencing BIM use in green building construction project management in the UK and China
Building Research & Information ( IF 3.9 ) Pub Date : 2023-05-21 , DOI: 10.1080/09613218.2023.2213356
Ling Tian 1 , Andrew Wright 1 , Birgit Painter 1 , Mehdi Pazhoohesh 1
Affiliation  

ABSTRACT

Decentralization and a lack of integration in the architecture, engineering and construction (AEC) industry are some of the main challenges for project management in green building construction. To address this problem, many construction companies have attempted to use building information modelling (BIM) to coordinate and optimize the management of green building projects. However, the research on successfully adopting and using BIM in interdisciplinary teams working on green building projects is limited; moreover, comprehensive comparisons across different countries and regions are lacking. Therefore, this study conducts a novel investigation of the key factors affecting the use of BIM in project management for green building construction through case studies in the UK and China. This study uses semi-structured interviews, Python-based term frequency analysis and thematic analysis to identify five key themes, namely, communication, data environment, motivation, project members and policy, which influence the adoption and implementation of BIM. In addition, based on gained insights, the impacts of different green building certification levels on BIM project management during the construction phase must be fully considered. These findings provide practical recommendations for BIM management in green building construction projects and contribute to the field of construction management.

更新日期:2023-05-21
down
wechat
bug