当前位置: X-MOL 学术Proc. Inst. Civ. Eng. Geotech. Eng. › 论文详情
Our official English website, www.x-mol.net, welcomes your feedback! (Note: you will need to create a separate account there.)
Challenges of earth pressure balance tunnelling in weathered granite with boulders
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering ( IF 2.0 ) Pub Date : 2020-12-16 , DOI: 10.1680/jgeen.20.00030
Nan Zhang 1 , Shui-Long Shen 2, 3 , An-Nan Zhou 3 , Hai-Min Lyu 4
Affiliation  

This paper presents a case history of an earth pressure balance shield tunnelling project in Guangzhou, China. It beings with an explanation of the project background and geological conditions on site. The shield machine passed through variably weathered granite with randomly distributed boulders. Based on the different geological formations, the tunnel alignment was classified into eight different zones. Tunnel face instability, ground collapse, groundwater ingress and excessive cutter wear were identified to be critical factors that affected the performance of the tunnel boring machine (TBM) and delayed the construction schedule. The impact mechanism on the surroundings during tunnelling was analysed. Countermeasures are recommended to improve the performance of TBMs in such difficult ground conditions on future projects.
更新日期:2020-12-16
down
wechat
bug