当前位置: X-MOL 学术Int. J. Min. Sci. Technol. › 论文详情
Our official English website, www.x-mol.net, welcomes your feedback! (Note: you will need to create a separate account there.)
A mathematical model for open pit mine production scheduling with Grade Engineering® and stockpiling
International Journal of Mining Science and Technology ( IF 11.7 ) Pub Date : 2021-04-21 , DOI: 10.1016/j.ijmst.2021.03.011
Karo Fathollahzadeh , Elham Mardaneh , Mehmet Cigla , Mohammad Waqar Ali Asad

This paper presents the development and implementation of an innovative mixed integer programming based mathematical model for an open pit mining operation with Grade Engineering framework. Grade Engineering comprises a range of coarse-separation based pre-processing techniques that separate the desirable (i.e. high-grade) and undesirable (i.e. low-grade or uneconomic) materials and ensure the delivery of only selected quantity of high quality (or high-grade) material to energy, water, and cost-intensive processing plant. The model maximizes the net present value under a range of operational and processing constraints. Given that the proposed model is computationally complex, the authors employ a data pre-processing procedure and then evaluate the performance of the model at several practical instances using computation time, optimality gap, and the net present value as valid measures. In addition, a comparison of the proposed and traditional (without Grade Engineering) models reflects that the proposed model outperforms the traditional formulation.



中文翻译:

采用 Grade Engineering® 和库存的露天矿生产调度数学模型

本文介绍了一种基于混合整数规划的创新数学模型的开发和实施,用于具有等级工程框架的露天采矿作业。等级工程包括一系列基于粗分离的预处理技术,这些技术将所需(即高品位)和不想要(即低品位或不经济)的材料分开,并确保仅提供选定数量的高质量(或高品位)材料。级)材料到能源、水和成本密集型加工厂。该模型在一系列操作和处理约束下最大化净现值。鉴于所提出的模型计算复杂,作者采用数据预处理程序,然后使用计算时间、最优性差距、和净现值作为有效措施。此外,所提出的模型和传统(无等级工程)模型的比较反映了所提出的模型优于传统公式。

更新日期:2021-04-21
down
wechat
bug