Weather-Related Construction Delays in a Changing Climate: A Systematic State-of-the-Art Review
Sustainability ( IF 3.3 ) Pub Date : 2021-03-06 , DOI: 10.3390/su13052861
Steven J. Schuldt , Mathew R. Nicholson , Yaquarri A. Adams , Justin D. Delorit

Adverse weather delays forty-five percent of construction projects worldwide, costing project owners and contractors billions of dollars in additional expenses and lost revenue each year. Additionally, changes in climate are expected to increase the frequency and intensity of weather conditions that cause these construction delays. Researchers have investigated the effect of weather on several aspects of construction. Still, no previous study comprehensively (1) identifies and quantifies the risks weather imposes on construction projects, (2) categorizes modeling and simulation approaches developed, and (3) summarizes mitigation strategies and adaptation techniques to provide best management practices for the construction industry. This paper accomplishes these goals through a systematic state-of-the-art review of 3207 articles published between 1972 and October 2020. This review identified extreme temperatures, precipitation, and high winds as the most impactful weather conditions on construction. Despite the prevalence of climate-focused delay studies, existing research fails to account for future climate in the modeling and identification of delay mitigation strategies. Accordingly, planners and project managers can use this research to identify weather-vulnerable activities, account for changing climate in projects, and build administrative or organizational capacity to assist in mitigating weather delays in construction. The cumulative contribution of this review will enable sustainable construction scheduling that is robust to a changing climate.

中文翻译:

气候变化中与天气有关的施工延误:系统的最新技术回顾

恶劣的天气延误了全球建筑项目的百分之四十五,每年使项目所有者和承包商付出数十亿美元的额外费用和收入损失。另外,气候变化有望增加导致这些施工延误的天气条件的频率和强度。研究人员已经研究了天气对建筑几个方面的影响。尽管如此,之前没有一项全面的研究(1)确定和量化天气对建筑项目的影响;(2)对开发的建模和模拟方法进行分类;(3)总结了缓解策略和适应技术,以为建筑业提供最佳管理实践。本文通过对1972年至2020年10月之间发表的3207篇文章进行系统的最新技术综述来实现这些目标。该综述确定了极端温度,降水和强风是对建筑影响最大的天气条件。尽管普遍存在着以气候为中心的延误研究,但现有的研究未能在延误缓解策略的建模和识别中考虑到未来的气候。因此,计划者和项目经理可以使用这项研究来确定易受天气影响的活动,解决项目中气候变化的问题,并建立行政或组织能力以协助减轻施工中的天气延迟。该评估的累积贡献将使可持续的施工进度能够适应不断变化的气候。此次审查确定了极端温度,降水和强风是对建筑影响最大的天气条件。尽管普遍存在着以气候为中心的延误研究,但现有的研究未能在延误缓解策略的建模和识别中考虑到未来的气候。因此,计划者和项目经理可以使用这项研究来确定易受天气影响的活动,解决项目中气候变化的问题,并建立行政或组织能力以协助减轻施工中的天气延迟。该评估的累积贡献将使可持续的施工进度能够适应不断变化的气候。此次审查确定了极端温度,降水和强风是对建筑影响最大的天气条件。尽管普遍存在着以气候为中心的延误研究,但现有的研究未能在延误缓解策略的建模和识别中考虑到未来的气候。因此,计划者和项目经理可以使用这项研究来确定易受天气影响的活动,解决项目中气候变化的问题,并建立行政或组织能力以协助减轻施工中的天气延迟。该评估的累积贡献将使可持续的施工进度能够适应不断变化的气候。尽管普遍存在着以气候为中心的延误研究,但现有的研究未能在延误缓解策略的建模和识别中考虑到未来的气候。因此,计划者和项目经理可以使用这项研究来确定易受天气影响的活动,解决项目中气候变化的问题,并建立行政或组织能力以协助减轻施工中的天气延迟。该评估的累积贡献将使可持续的施工进度能够适应不断变化的气候。尽管普遍存在着以气候为中心的延误研究,但现有的研究未能在延误缓解策略的建模和识别中考虑到未来的气候。因此,计划者和项目经理可以使用这项研究来确定易受天气影响的活动,解决项目中气候变化的问题,并建立行政或组织能力以协助减轻施工中的天气延迟。该评估的累积贡献将使可持续的施工进度能够适应不断变化的气候。考虑到项目中气候变化的原因,并建立行政或组织能力以协助减轻施工中的天气延迟。该评估的累积贡献将使可持续的施工进度能够适应不断变化的气候。考虑到项目中气候变化的原因,并建立行政或组织能力以协助减轻施工中的天气延迟。该评估的累积贡献将使可持续的施工进度能够适应不断变化的气候。