A feasibility study on construction methods of high voltage transmission towers’ foundations
Archives of Civil and Mechanical Engineering ( IF 4.4 ) Pub Date : 2021-03-04 , DOI: 10.1007/s43452-021-00197-4
Iman Mozakka , Mehran Zeynalian , Mahmoud Hashemi

Civil engineering projects deal with different risks over their life-cycle. Generally, risk sources are categorized into three types of cost, time, and project quality. The Modified Advanced Programmatic Risk Analysis Model (MAPRAM) is one of the leading approaches in this field that can assess the risks of the project on its whole life cycle. Electricity transmission lines have always been one of the most costly and time-consuming infrastructure projects. The costs of these projects play a significant role in a country's development budget. Given the considerable time and cost of constructing the foundations for power transmission towers, providing an economical design will significantly help in reducing duration and budget of these projects. In this study, using MAPRAM, first, different types of foundations of power transmission lines were studied; then the optimal foundations were introduced for a specific place as a case study, shaping a general framework to appoint the optimal foundation for power transmission lines in different areas. The foundations studied in this study included: pad & chimney foundation, auger foundation, steel grillage foundation, concrete piles, and helical piles. Initially, different types of foundations were designed, and then, the costs of each foundation in a whole life-cycle were estimated. Next, the risks and probability of their occurrence were identified for each type of foundation. Finally, the appropriate foundation was determined for the studied soil samples by performing an optimization process.



中文翻译:

高压输电塔基础施工方法的可行性研究

土木工程项目在其生命周期中应对不同的风险。通常,风险源分为成本,时间和项目质量三种类型。改进的高级程序化风险分析模型(MAPRAM)是该领域的领先方法之一,可以评估项目在整个生命周期中的风险。输电线路一直是最昂贵,最耗时的基础设施项目之一。这些项目的费用在一个国家的发展预算中起着重要作用。考虑到建造输电塔基础的大量时间和成本,提供经济的设计将大大有助于减少这些项目的工期和预算。在这项研究中,首先使用MAPRAM,研究了不同类型的输电线路基础;然后以案例研究为基础,介绍了针对特定地点的最佳基础,从而形成了一个通用框架,为不同地区的输电线路指定最佳基础。在这项研究中研究的基础包括:垫和烟囱基础,螺旋钻基础,钢格栅基础,混凝土桩和螺旋桩。最初,设计了不同类型的基金会,然后估算了整个生命周期中每个基金会的成本。接下来,针对每种类型的基金会确定其发生的风险和可能性。最后,通过执行优化过程为研究的土壤样品确定合适的基础。然后以案例研究为基础,介绍了针对特定地点的最佳基础,从而形成了一个通用框架,为不同地区的输电线路指定最佳基础。在这项研究中研究的基础包括:垫和烟囱基础,螺旋钻基础,钢格栅基础,混凝土桩和螺旋桩。最初,设计了不同类型的基金会,然后估算了整个生命周期中每个基金会的成本。接下来,针对每种类型的基金会确定其发生的风险和可能性。最后,通过执行优化过程为研究的土壤样品确定合适的基础。然后以案例研究为基础,介绍了针对特定地点的最佳基础,从而形成了一个通用框架,为不同地区的输电线路指定最佳基础。在这项研究中研究的基础包括:垫和烟囱基础,螺旋钻基础,钢格栅基础,混凝土桩和螺旋桩。最初,设计了不同类型的基金会,然后估算了整个生命周期中每个基金会的成本。接下来,针对每种类型的基金会确定其发生的风险和可能性。最后,通过执行优化过程为研究的土壤样品确定合适的基础。在这项研究中研究的基础包括:垫和烟囱基础,螺旋钻基础,钢格栅基础,混凝土桩和螺旋桩。最初,设计了不同类型的基金会,然后估算了整个生命周期中每个基金会的成本。接下来,针对每种类型的基金会确定其发生的风险和可能性。最后,通过执行优化过程为研究的土壤样品确定合适的基础。在这项研究中研究的基础包括:垫和烟囱基础,螺旋钻基础,钢格栅基础,混凝土桩和螺旋桩。最初,设计了不同类型的基金会,然后估算了整个生命周期中每个基金会的成本。接下来,针对每种类型的基金会确定其发生的风险和可能性。最后,通过执行优化过程为研究的土壤样品确定合适的基础。