当前位置: X-MOL 学术Utilities Policy › 论文详情
Our official English website, www.x-mol.net, welcomes your feedback! (Note: you will need to create a separate account there.)
Water company productivity change: A disaggregated approach accounting for changes in inputs and outputs
Utilities Policy ( IF 3.8 ) Pub Date : 2021-03-02 , DOI: 10.1016/j.jup.2021.101190
Manuel Mocholi-Arce , Ramon Sala-Garrido , Maria Molinos-Senante , Alexandros Maziotis

The assessment of the productivity change of water utilities provides essential information to sector managers and regulators. This study uses the Luenberger-Hicks-Moorsteen Productivity Indicator (LHMPI) to evaluate productivity change as it can be further decomposed into three components namely technical change (TC), technical efficiency change (TEC), and scale efficiency change (SEC). This study evaluates the productivity of several water companies in England and Wales from 2001 to 2018. We found that productivity declined 1.2% per year due to the use of inputs that increased by 1.4% per year relative to outputs that increased by 0.2% per year.



中文翻译:

自来水公司生产率的变化:一种分解方法,考虑了投入和产出的变化

对水务公司生产力变化的评估为部门经理和监管者提供了重要信息。这项研究使用Luenberger-Hicks-Moorsteen生产率指标(LHMPI)来评估生产率变化,因为它可以进一步分解为三个组成部分,即技术变化(TC),技术效率变化(TEC)和规模效率变化(SEC)。这项研究评估了2001年至2018年英格兰和威尔士几家自来水公司的生产率。我们发现,由于使用的投入每年增长1.4%,而使用的产出每年增长0.2%,因此生产率每年下降1.2% 。

更新日期:2021-03-03
down
wechat
bug