当前位置: X-MOL 学术IEEE Power Energy Mag. › 论文详情
Our official English website, www.x-mol.net, welcomes your feedback! (Note: you will need to create a separate account there.)
Operational Security: The Case of Texas
IEEE Power and Energy Magazine ( IF 2.8 ) Pub Date : 2021-02-22 , DOI: 10.1109/mpe.2020.3043611
Julia Matevosyan , Shun Hsien Huang , Pengwei Du , Nitika Mago , Rochie Guiyab

The electric reliability council of Texas (ERCOT) is the independent transmission system operator that manages the flow of electric power to serve 90% of the state's electric load. ERCOT's system-wide load peaked at 74,820 MW on 12 August 2019.

中文翻译:

运营安全:以德克萨斯州为例

德克萨斯州电力可靠性委员会(ERCOT)是独立的输电系统运营商,负责管理电力流量以服务该州90%的电力负荷。ERCOT的全系统负荷在2019年8月12日达到74,820 MW的峰值。
更新日期:2021-02-23
down
wechat
bug