当前位置: X-MOL 学术Autom. Constr. › 论文详情
Our official English website, www.x-mol.net, welcomes your feedback! (Note: you will need to create a separate account there.)
Modular composite building in urgent emergency engineering projects: A case study of accelerated design and construction of Wuhan Leishenshan/Leishenshan hospital to COVID-19 pandemic
Automation in Construction ( IF 9.6 ) Pub Date : 2021-04-01 , DOI: 10.1016/j.autcon.2021.103555
Ling-Kun Chen 1, 2, 3 , Rui-Peng Yuan 1 , Xing-Jun Ji 4 , Xing-Yu Lu 1 , Jiang Xiao 1 , Jun-Bo Tao 5 , Xin Kang 1 , Xin Li 6 , Zhen-Hua He 7 , Shu Quan 8 , Li-Zhong Jiang 9
Affiliation  

Wuhan Leishenshan/Leishenshan hospital is a makeshift emergency hospital for treating patients diagnosed with the novel coronavirus-infected pneumonia (NCIP). Engineering construction uses modular composite building finished products to the greatest extent, which reduces the workload of field operations and saves a lot of time. The building information model (BIM) technology assists in design and construction work to meet rapid construction requirements. Besides, based on the unmanned aerial vehicles (UAVs) data analysis and application platform, digitization and intelligence in engineering construction are improved. Simultaneously, on-site construction and overall hoisting were carried out to achieve maximum efficiency. This article aims to take the construction of Leishenshan Hospital as an example to illustrate how to adopt BIM technology and other high-tech technology such as big data, artificial intelligence, drones, and 5G for the fast construction of the fabricated steel structure systems in emergency engineering projects.

中文翻译:

紧急应急工程项目中的模块化复合建筑:武汉雷神山/雷神山医院为应对COVID-19大流行而加速设计和建造的案例研究

武汉雷神山/雷神山医院是一所救治新型冠状病毒感染的肺炎(NCIP)患者的临时急诊医院。工程建设最大程度地采用模块化复合建筑成品,减少了现场作业的工作量,节省了大量时间。建筑信息模型 (BIM) 技术协助设计和施工工作,以满足快速施工要求。此外,基于无人机数据分析与应用平台,提升工程建设的数字化、智能化水平。同时进行现场施工和整体吊装,以达到最大效率。
更新日期:2021-04-01
down
wechat
bug