Case studies on best practices in construction of long-span bridge projects in India
Proceedings of the Institution of Civil Engineers - Civil Engineering ( IF 0.4 ) Pub Date : 2021-01-04 , DOI: 19.00046
G Muneeswaran, P Devadas Manoharan, T Vijayakumar

This paper describes the key challenges faced in three recent long-span bridge projects in India and explains how they were overcome through the application of novel construction methods. They include constructability changes in the precast works for the Barapullah elevated corridor phase 3 in New Delhi, a temporary bamboo pile jetty system for Bihar’s New Ganga Bridge project near Patna and a combined precast yard with a load-out facility for the Durgam Cheruvu Bridge in Hyderabad. The new approaches adopted in these case studies resulted in considerable cost and time savings compared with the original plans.

中文翻译:

印度大跨度桥梁项目建设最佳实践案例研究

本文描述了印度最近三个大跨度桥梁项目面临的主要挑战,并解释了如何通过应用新颖的施工方法来克服这些挑战。其中包括新德里Barapullah高架走廊三期的预制工程的可施工性变更,Bihar在巴特那附近的New Ganga桥项目的临时竹桩码头系统以及在印度的Durgam Cheruvu桥的联合预制场和卸货设施。海得拉巴。与原始计划相比,这些案例研究采用的新方法可节省大量成本和时间。