The D/W pressure at Fukushima Daiichi Nuclear Power Plant Unit-2 dropped from 0.73 MPa [abs] to 0.155 MPa [abs] between 7:20 and 11:20 on the March15th, 2011. We assumed gas leakage from the PCV an...

中文翻译:

2011年3月15日上午福岛第一核电站2号机组安全壳降压情景推断

2011 年 3 月 15 日 7 点 20 分到 11 点 20 分,福岛第一核电站 2 号机组的 D/W 压力从 0.73 MPa [abs] 下降到 0.155 MPa [abs]。 ..