当前位置:
X-MOL 学术
›
Proc. Inst. Civ. Eng. Civ. Eng.
›
论文详情
Our official English website, www.x-mol.net, welcomes your
feedback! (Note: you will need to create a separate account there.)
Transforming delivery of Water Street Bridge abutment in London, UK through innovation
Proceedings of the Institution of Civil Engineers - Civil Engineering ( IF 0.4 ) Pub Date : 2020-08-01 , DOI: 10.1680/jcien.19.00023 Alastair Courtney 1
Proceedings of the Institution of Civil Engineers - Civil Engineering ( IF 0.4 ) Pub Date : 2020-08-01 , DOI: 10.1680/jcien.19.00023 Alastair Courtney 1
Affiliation
This paper describes the innovative temporary works used for abutment construction of a moveable bridge in London’s Docklands. Completed in 2019, the 27 m span Water Street Bridge and its approach ...
中文翻译:
通过创新改变英国伦敦水街桥基台的交付
本文介绍了伦敦Docklands的可动桥梁的桥墩施工中使用的创新性临时工程。27 m跨度的水街大桥于2019年完工,其方法...
更新日期:2020-08-01
中文翻译:
通过创新改变英国伦敦水街桥基台的交付
本文介绍了伦敦Docklands的可动桥梁的桥墩施工中使用的创新性临时工程。27 m跨度的水街大桥于2019年完工,其方法...