当前位置:
X-MOL 学术
›
IEEJ Trans. Electr. Electron. Eng.
›
论文详情
Our official English website, www.x-mol.net, welcomes your
feedback! (Note: you will need to create a separate account there.)
Erratum
IEEJ Transactions on Electrical and Electronic Engineering ( IF 1.0 ) Pub Date : 2020-11-25 , DOI: 10.1002/tee.23283
Table II. Reduction rates (%) in the voltage violating time
中文翻译:
勘误表
表二。违反电压时间的降低率(%)
更新日期:2020-12-20
IEEJ Transactions on Electrical and Electronic Engineering ( IF 1.0 ) Pub Date : 2020-11-25 , DOI: 10.1002/tee.23283
Correction to the article TEE23147 published in the July issue of IEEJ Transactions on Electrical and Electronic Engineering, Vol. 15, No. 7, 2020, pp. 1032–1039. DOI:10.1002/tee.23147
Table II of the above article was incorrect. It should have read as follows:
Case No. | 71.7% PV installation | 100% PV installation | ||
---|---|---|---|---|
Method 1 | Method 2 | Method 1 | Method 2 | |
1 | 59.1 | 69.7 | 80.7 | 97.2 |
2 | 50.5 | 10.9 | −59.6 | 62.6 |
3 | 71.6 | 90.3 | 83.1 | 97.7 |
4 | 15.1 | 41.1 | 75.4 | 81.7 |
5 | 74.9 | 88.9 | 85.5 | 97.6 |
6 | 69.4 | 92.8 | 83.2 | 98.4 |
7 | 75.4 | 88.8 | 85.9 | 97.5 |
8 | 72.4 | 96.3 | 84.0 | 98.7 |
9 | 41.2 | 56.9 | 82.9 | 96.5 |
10 | 26.9 | 35.7 | 73.2 | 77.7 |
Average | 55.7 | 67.1 | 67.4 | 90.6 |
The publisher apologizes for any inconvenience this may have caused.
中文翻译:
勘误表
对TEE23147文章的更正,该文章发表在《IEEJ电气和电子工程学报》第七卷上。2020年第15期,第7期,第1032-1039页。DOI:10.1002 / tee.23147
以上文章的表II不正确。它的内容如下:
案号 | 光伏安装量的71.7% | 100%光伏安装 | ||
---|---|---|---|---|
方法1 | 方法2 | 方法1 | 方法2 | |
1个 | 59.1 | 69.7 | 80.7 | 97.2 |
2 | 50.5 | 10.9 | −59.6 | 62.6 |
3 | 71.6 | 90.3 | 83.1 | 97.7 |
4 | 15.1 | 41.1 | 75.4 | 81.7 |
5 | 74.9 | 88.9 | 85.5 | 97.6 |
6 | 69.4 | 92.8 | 83.2 | 98.4 |
7 | 75.4 | 88.8 | 85.9 | 97.5 |
8 | 72.4 | 96.3 | 84.0 | 98.7 |
9 | 41.2 | 56.9 | 82.9 | 96.5 |
10 | 26.9 | 35.7 | 73.2 | 77.7 |
平均 | 55.7 | 67.1 | 67.4 | 90.6 |
对于由此带来的任何不便,出版商深表歉意。