当前位置:
X-MOL 学术
›
J. Am. Water Works Assoc.
›
论文详情
Our official English website, www.x-mol.net, welcomes your
feedback! (Note: you will need to create a separate account there.)
Detroit's Robust Full Lead Service Line Replacement Program
Journal American Water Works Association ( IF 0.7 ) Pub Date : 2020-10-04 , DOI: 10.1002/awwa.1593 Samuel A. Smalley , Bryan Peckinpaugh
Journal American Water Works Association ( IF 0.7 ) Pub Date : 2020-10-04 , DOI: 10.1002/awwa.1593 Samuel A. Smalley , Bryan Peckinpaugh
In 2018, the state of Michigan implemented a revised Lead and Copper Rule that required replacement of all existing lead service lines.
中文翻译:
底特律强大的全铅服务线更换计划
2018年,密歇根州实施了修订的铅和铜规则,该规则要求更换所有现有的铅服务线。
更新日期:2020-10-05
中文翻译:
底特律强大的全铅服务线更换计划
2018年,密歇根州实施了修订的铅和铜规则,该规则要求更换所有现有的铅服务线。