当前位置: X-MOL 学术Metallurgist › 论文详情
Our official English website, www.x-mol.net, welcomes your feedback! (Note: you will need to create a separate account there.)
Methodology of Technical Re-Equipment and Modernization of Furnace Structures and Operating Modes
Metallurgist ( IF 0.8 ) Pub Date : 2020-09-01 , DOI: 10.1007/s11015-020-01030-8
G. M. Druzhinin , A. A. Ashikhmin , P. V. Maslov , A. B. Popov , I. M. Khammatov , N. B. Loshkarev

Presently, the furnace stock of the ferrous metallurgy and heavy engineering industry comprises approximately 55%–60% of units with service life over 30–50 years. Considering that constructing new furnaces requires significant financial investments and reduces production over a long period, the technical re-equipment and modernization of units in accordance with modern requirements have become widely adopted. This paper presents an appropriate methodology for the technical re-equipment and modernization, one that enables reducing time and achieving the optimal result with the lowest cost.

中文翻译:

技术改造和熔炉结构和操作模式现代化的方法

目前,黑色冶金和重型工程行业的炉料约占使用寿命超过 30-50 年的装置的 55%-60%。考虑到建设新炉需要大量的资金投入和长期的减产,按照现代要求对机组进行技术改造和现代化已被广泛采用。本文提出了一种适用于技术再装备和现代化的方法,可以减少时间并以最低的成本实现最佳结果。
更新日期:2020-09-01
down
wechat
bug