当前位置: X-MOL 学术SPE Reserv. Eval. Eng. › 论文详情
Our official English website, www.x-mol.net, welcomes your feedback! (Note: you will need to create a separate account there.)
Errata for Fast Analysis of Optimal Improved-Oil-Recovery Switch Time Using a Two-Factor Production Model and Least-Squares Monte Carlo Algorithm
SPE Reservoir Evaluation & Engineering ( IF 2.1 ) Pub Date : 2019-05-01 , DOI: 10.2118/191327-er
Aojie Hong , Reidar B. Bratvold , Larry W. Lake

The authors of SPE-191327-PA [ SPE Res Eval & Eng (in press; posted online 29 November 2018) https://doi.org/10.2118/191327-PA] have submitted corrections to the preprint paper. Full paragraphs are provided for context as applicable; all text corrections are marked in red. While these changes have been incorporated into the preprint paper, this errata will be included as supporting information to the paper as part of the version record.



中文翻译:

使用两要素生产模型和最小二乘蒙特卡洛算法快速分析最佳改良油采收切换时间的勘误表

SPE-191327-PA [ SPE Res Eval&Eng(印刷; 2018年11月29日在线发布)https://doi.org/10.2118/191327-PA]的作者已对预印本进行了更正。提供了完整的段落供上下文参考;所有文本更正均标记为红色。虽然这些更改已包含在预印本中,但此勘误将作为支持信息包含在纸中,作为版本记录的一部分。

更新日期:2019-05-01
down
wechat
bug