当前位置: X-MOL 学术Phys. Part. Nuclei Lett. › 论文详情
Our official English website, www.x-mol.net, welcomes your feedback! (Note: you will need to create a separate account there.)
Current Status and Planned Upgrades of the VEPP-5 Injection Complex
Physics of Particles and Nuclei Letters ( IF 0.4 ) Pub Date : 2020-07-27 , DOI: 10.1134/s1547477120040056
K. Astrelina , A. Andrianov , V. Balakin , A. Barnyakov , O. Belikov , D. Berkaev , M. Blinov , Yu. Boymelshteyn , D. Bolkhovityanov , V. Borin , A. Butakov , S. Vasilev , F. Emanov , G. Karpov , A. Kasaev , A. Kondakov , I. Koop , N. Kot , G. Kurkin , R. Lapik , N. Lebedev , A. Levichev , Yu. Maltseva , A. Martynovskiy , P. Martyshkin , O. Meshkov , S. Motygin , A. Murasev , V. Myslivets , D. Nikiforov , A. Pilan , Yu. Rogovsky , S. Samoylov , A. Tribendis , A. Frolov , A. Tsyganov

Abstract

The VEPP-5 injection complex, consisting of two linacs and a damping storage ring, delivers electron and positron beams to the VEPP-4M and VEPP-2000 colliders operating at BINP. Over three years of injector operation, its efficiency has significantly increased and the maximum positron-storage rate has reached 1.2 × 1010 s–1. This progress was reached through tuning the constituent machines, upgrading the accelerator technology, and deploying a new 11-MHz station of RF cavities. By the start of the next running season, a new electron gun with a significantly increased maximum current and cathode lifetime will be installed.


中文翻译:

VEPP-5注射复合体的现状和计划升级

摘要

VEPP-5注射复合体由两个直线加速器和一个阻尼存储环组成,将电子束和正电子束传递给在BINP运行的VEPP-4M和VEPP-2000对撞机。经过三年的喷射器运行,其效率已大大提高,最大正电子存储速率已达到1.2×10 10 s –1。通过调整组成机器,升级加速器技术并部署新的11 MHz RF腔站,可以实现这一进展。在下一个运行季节开始之前,将安装新的电子枪,该电子枪的最大电流和阴极寿命将大大增加。
更新日期:2020-07-27
down
wechat
bug