A study on 3D/BIM-based on-site performance measurement system for building construction
Journal of Asian Architecture and Building Engineering ( IF 1.5 ) Pub Date : 2020-06-22 , DOI: 10.1080/13467581.2020.1763364
HeeSung Cha 1 , Jun Kim 1
Affiliation  

ABSTRACT Performance measurement has become conventional in construction management. However, it is non-trivial to establish an effective system to capture, evaluate, and feedback the on-site data. Whilst 3D object–based technology prevails in the industry, project managers remain accustomed to text-based system. Unstructured data format requires a tremendous amount of time and effort when analyzing a project in detail. To overcome this issue, an extensive literature review in conjunction with industry feedback has been conducted. Based on this preliminary investigation, the authors have proposed an on-site performance measurement system that interlinks 3D object with a spreadsheet. The system enables project managers to recognize the performance and/or productivity of a project in real time and helps find timely remedies in updating the original plan. One of the key findings includes that the identified eight on-site productivity factors should be embedded into a 3D model in effectively measuring the performance for a particular project. The new system also provides a useful tool in managing the productivity of a project. The main contribution of this study is the proposition and verification of a novel methodology that effectively manages on-site performance information by relating 3D objects with productivity factors in building construction.

中文翻译:

基于3D/BIM的建筑施工现场性能测量系统研究

摘要 绩效衡量已成为施工管理中的常规方法。然而,建立一个有效的系统来捕获、评估和反馈现场数据并非易事。虽然基于 3D 对象的技术在行业中盛行,但项目经理仍然习惯于基于文本的系统。在详细分析项目时,非结构化数据格式需要大量的时间和精力。为了解决这个问题,我们结合行业反馈进行了广泛的文献综述。基于此初步调查,作者提出了一种现场性能测量系统,该系统将 3D 对象与电子表格互连。该系统使项目经理能够实时识别项目的绩效和/或生产力,并帮助及时找到更新原始计划的补救措施。主要发现之一包括确定的八个现场生产力因素应嵌入到 3D 模型中,以有效衡量特定项目的绩效。新系统还提供了一个管理项目生产力的有用工具。本研究的主要贡献是提出并验证了一种新颖的方法,该方法通过将 3D 对象与建筑施工中的生产力因素相关联来有效管理现场性能信息。主要发现之一包括确定的八个现场生产力因素应嵌入到 3D 模型中,以有效衡量特定项目的绩效。新系统还提供了一个管理项目生产力的有用工具。本研究的主要贡献是提出并验证了一种新颖的方法,该方法通过将 3D 对象与建筑施工中的生产力因素相关联来有效管理现场性能信息。主要发现之一包括确定的八个现场生产力因素应嵌入到 3D 模型中,以有效衡量特定项目的绩效。新系统还提供了一个管理项目生产力的有用工具。本研究的主要贡献是提出并验证了一种新颖的方法,该方法通过将 3D 对象与建筑施工中的生产力因素相关联来有效管理现场性能信息。