当前位置: X-MOL 学术Int. J. Prod. Res. › 论文详情
Our official English website, www.x-mol.net, welcomes your feedback! (Note: you will need to create a separate account there.)
A note on scheduling on uniform parallel machines with unavailability constraints
International Journal of Production Research ( IF 7.0 ) Pub Date : 2020-07-13 , DOI: 10.1080/00207543.2020.1788739
Dehua Xu 1 , Limin Xu 1 , Zhijun Xu 2 , Xianyu Yu 3
Affiliation  

We show by counterexample that the binary integer quadratic programming model proposed by Kaabi and Harrath [2019. “Scheduling on Uniform Parallel Machines with Periodic Unavailability Constraints.” International Journal of Production Research 57: 216–227] is incorrect. We fix this model and propose two linear ones.



中文翻译:

关于在具有不可用性约束的统一并行机上进行调度的说明

我们通过反例展示了 Kaabi 和 Harrath [2019.] 提出的二进制整数二次规划模型。“在具有周期性不可用性约束的均匀并行机上进行调度。” 国际生产研究杂志57:216–227] 是不正确的。我们修复了这个模型并提出了两个线性模型。

更新日期:2020-07-13
down
wechat
bug