当前位置:
X-MOL 学术
›
Eng. Optim.
›
论文详情
Our official English website, www.x-mol.net, welcomes your
feedback! (Note: you will need to create a separate account there.)
Metaheuristics for two-stage flow-shop assembly problem with a truncation learning function
Engineering Optimization ( IF 2.2 ) Pub Date : 2020-05-07 , DOI: 10.1080/0305215x.2020.1757089 Chin-Chia Wu, Xingong Zhang, Ameni Azzouz, Wei-Lun Shen, Shuenn-Ren Cheng, Peng-Hsiang Hsu, Win-Chin Lin
Engineering Optimization ( IF 2.2 ) Pub Date : 2020-05-07 , DOI: 10.1080/0305215x.2020.1757089 Chin-Chia Wu, Xingong Zhang, Ameni Azzouz, Wei-Lun Shen, Shuenn-Ren Cheng, Peng-Hsiang Hsu, Win-Chin Lin
This study examines a two-stage three-machine flow-shop assembly scheduling model in which job processing time is considered as a mixed function of a controlled truncation parameter with a sum-of-p...
中文翻译:
具有截断学习函数的两阶段流水车间装配问题的元启发式
本研究检验了两阶段三机流水车间装配调度模型,其中作业处理时间被视为受控截断参数与 p 总和的混合函数。
更新日期:2020-05-07
中文翻译:
具有截断学习函数的两阶段流水车间装配问题的元启发式
本研究检验了两阶段三机流水车间装配调度模型,其中作业处理时间被视为受控截断参数与 p 总和的混合函数。