J-PARC 3-GeV RCS: 1-MW beam operation and beyond
Journal of Instrumentation ( IF 1.3 ) Pub Date : 2020-07-22 , DOI: 10.1088/1748-0221/15/07/p07022
H. Hotchi , H. Harada , N. Hayashi , M. Kinsho , K. Okabe , P.K. Saha , Y. Shobuda , F. Tamura , K. Yamamoto , M. Yamamoto , M. Yoshimoto

The J-PARC 3-GeV rapid cycling synchrotron (RCS) has recently achieved a 1-MW beam operation with considerably low fractional beam loss of a couple of 10−3 as a result of continuous efforts iterating experiments and numerical simulations. This success of the 1-MW beam operation opened a door to further beam power ramp-up beyond 1 MW; we are now promoting 1.2~1.5-MW-equivalent high-intensity beam tests looking ahead to future upgrades at J-PARC. In this article, we first review the current status of beam loss in the 1-MW beam operation, then presenting the recent results of the 1.2-MW beam tests with particular emphasis on our approaches to beam loss issues. The beam intensity limit of the RCS is also discussed with well-established numerical simulations.

中文翻译:

J-PARC 3-GeV RCS:1-MW 光束运行及以上

由于不断努力迭代实验和数值模拟,J-PARC 3-GeV 快速循环同步加速器 (RCS) 最近实​​现了 1 MW 光束操作,具有相当低的部分光束损失,仅为 10-3。1 兆瓦光束运行的这一成功为进一步将光束功率提升至 1 兆瓦以上打开了大门;我们现在正在推广 1.2~1.5-MW 等效高强度光束测试,展望未来 J-PARC 的升级。在本文中,我们首先回顾了 1 MW 光束操作中光束损耗的当前状态,然后介绍了 1.2 MW 光束测试的最新结果,特别强调了我们解决光束损耗问题的方法。RCS 的光束强度限制也通过完善的数值模拟进行了讨论。