Temporary works for demolition of Earls Court Exhibition Centre in London, UK
Proceedings of the Institution of Civil Engineers - Civil Engineering ( IF 0.4 ) Pub Date : 2020-07-06 , DOI: 19.00055
Tomasz Mochol, Stuart Vaughan

This paper describes the challenging temporary works used for demolishing the vast Earls Court Exhibition Centre in London, UK, in particular the removal of a major access bridge and one of the main roofs. The bridge, which provided vehicular and pedestrian access between the two main exhibition halls over a railway line, was removed by cutting, lifting and sliding entire spans. The 1300 t truss roof was lowered 28 m to ground level in a single operation using strand jacks. The works were a serious challenge because of the conditions and requirements of both the client and various structural, logistical and environmental factors. The temporary works also required a very large number of designs and other documents to be prepared and approved by multiple parties.

中文翻译:

英国伦敦伯爵府展览中心的临时工程

本文介绍了用于拆除英国伦敦庞大的伯爵府展览中心的具有挑战性的临时工程,特别是拆除了一座主要的通道桥和一个主要屋顶。通过切割,提升和滑动整个跨度,拆除了桥梁,该桥梁在铁路上的两个主要展览馆之间提供了车辆和行人通道。使用绞车千斤顶一次即可将1300吨的桁架屋顶降低到地面28 m。由于客户的条件和要求以及各种结构,物流和环境因素,这些工作是一个严峻的挑战。临时工程还需要准备大量的设计和其他文件,并由多方批准。