Numerical analysis and application of the construction method for the small interval tunnel in the turn line of metro
Science Progress ( IF 1.906 ) Pub Date : 2020-06-29 , DOI: 10.1177/0036850420932067
Zhanping Song; Xiaoxu Tian; Qi Liu; Yuwei Zhang; Heng Li; Guannan Zhou

The surrounding rock may become unstable or even fall down and the initial support may crack and be destroyed when the construction method of the underground excavation tunnel is not properly selected in the turn line of metro. . A section of the Santunbei turn line of Urumqi Metro Line 1# was taken as the engineering background. The proposed construction method was analyzed by numerical simulation. Numerical analysis shows that the final surface settlement caused by the proposed construction method is 3.0 mm and the horizontal convergence is 3.2 mm. It also turns out that the proposed construction method causes less deformation, and the method can be applied to the construction of the small interval tunnel in the Santunbei turn line of metro. The rationality of the method and numerical model was further verified by comparison between the monitored data of surface settlement, horizontal convergence and vault sinking, and numerical simulation results. Finally, the deformation and stress of the six construction methods were compared. The deformation and stress caused by the six construction methods are almost the same. It indicates that the construction spacing between the left and right tunnels does not affect the safety of tunnel construction. Therefore, the appropriate construction spacing could be selected according to the resource configuration, instead of deformation and stress.
更新日期:2020-06-29

 

全部期刊列表>>
胸部和胸部成像专题
自然科研论文编辑服务
ACS ES&T Engineering
ACS ES&T Water
屿渡论文,编辑服务
鲁照永
华东师范大学
苏州大学
南京工业大学
南开大学
中科大
唐勇
跟Nature、Science文章学绘图
隐藏1h前已浏览文章
中洪博元
课题组网站
新版X-MOL期刊搜索和高级搜索功能介绍
ACS材料视界
x-mol收录
广东实验室
南京大学
王杰
南科大
刘尊峰
湖南大学
清华大学
王小野
中山大学化学工程与技术学院
试剂库存
天合科研
down
wechat
bug