当前位置: X-MOL 学术Int. J. Syst. Assur. Eng. Manag. › 论文详情
Our official English website, www.x-mol.net, welcomes your feedback! (Note: you will need to create a separate account there.)
Three reliability models of a building cable manufacturing plant: a comparative analysis
International Journal of System Assurance Engineering and Management Pub Date : 2020-06-26 , DOI: 10.1007/s13198-020-01012-8
S. Z. Taj , S. M. Rizwan , B. M. Alkali , D. K. Harrison , G. Taneja

In this paper, comparative analysis between the profits of three reliability models of a building cable manufacturing plant is carried out. To facilitate the analysis, real maintenance data of the plant are collected. Three case specific reliability models of the plant are developed. Semi-Markov processes and regenerative point techniques are used to estimate optimized reliability indices of the plant; such as; mean time to plant failure, plant availability, expected number of plant repairs, expected busy period of the repairman and profit incurred to the plant. Comparison between the profits is demonstrated through graphical analysis.

中文翻译:

建筑电缆制造厂的三种可靠性模型:比较分析

本文对建筑电缆制造厂的三种可靠性模型的利润进行了比较分析。为了便于分析,收集了工厂的实际维护数据。开发了三种情况下的工厂可靠性模型。半马尔可夫过程和再生点技术用于估计工厂的优化可靠性指标;如; 平均工厂故障时间,工厂可用性,预期的工厂维修次数,预期的修理工忙碌时间以及对工厂产生的利润。利润之间的比较通过图形化分析得到证明。
更新日期:2020-06-26
down
wechat
bug