当前位置: X-MOL 学术Struct. Eng. Int. › 论文详情
Our official English website, www.x-mol.net, welcomes your feedback! (Note: you will need to create a separate account there.)
RC 82 “Pont Bleu” Replacement and Refurbishment
Structural Engineering International ( IF 1.1 ) Pub Date : 2020-05-12 , DOI: 10.1080/10168664.2020.1750938
Hugo Anacleto 1
Affiliation  

The “Pont Bleu” replacement and refurbishment project consists of the reconstruction of an existing road viaduct, with a traffic load of 20,000 vehicles/day and spanning two roads and eight railway...

中文翻译:

RC 82“Pont Bleu”更换和翻新

“Pont Bleu”更换和翻新项目包括改造现有道路高架桥,交通负荷为20,000辆/天,跨越两条道路和八条铁路......
更新日期:2020-05-12
down
wechat
bug