Location selection factors of concentrated solar power plant investments
Sustainable Energy Grids & Networks ( IF 4.8 ) Pub Date : 2020-03-02 , DOI: 10.1016/j.segan.2020.100319
Burak Omer Saracoglu

This research aims to find, define, identify, describe, select and cluster (group, set) the location selection factors of very large concentrated solar power plant investments in Supergrids (super grid) and Global Grid with location selection factors module of the 1st generation Original Anatolian Honeybees’ investment decision support methodology. 11 preliminary screening investment stage criteria (e.g. CA: Direct normal irradiation/irradiance/insolation (DNI), CD: High-Voltage Direct Current (HVDC) & High-Voltage Alternating Current (HVAC) electrification/power grid infrastructure, CG: Political, war, terror & security conditions), and 287 pre-feasibility investment stage criteria (e.g. CB: Governments’ Supergrid integration policy, CB1: Common Supergrid framework, legislation, and directive development willingness, CB2: Common Supergrid electricity transmission law/regulation development willingness) are presented in a semantically clustered form by Grey Weighted Product Method based on expert judgments (3 linguistic variables in grey numbers and equal weight mean whitenization) weighting integrated with experience curve in select awarded criteria honeycomb cell, and Fuzzy Decision-Making Trial and Evaluation Laboratory combined with Simple Additive Weighting Method based on expert judgments (3 linguistic variables in triangular fuzzy membership functions, and graded mean integration defuzzification) weighting integrated with experience curve in complex clustering honeycomb cell. 11 criteria at only 1 hierarchical level (factors) and 287 criteria at 4 hierarchical levels (i.e. main factors, factors, 1st level sub-factor, 2nd level sub-factors) are semantically clustered respectively for preliminary screening and pre-feasibility project investment development stages.



中文翻译:

太阳能集中电站投资的选址因素

这项研究的目的是寻找,定义,识别,描述,选择和聚类(分组,设置)超大型电网(超级电网)和全球电网中具有位置选择因子模块的大型太阳能集中电站投资的位置选择因子。 1个sŤ 一代安纳托利亚原始蜜蜂的投资决策支持方法。11个初步筛选投资阶段标准(例如C一种:直接正常辐射/辐照/日照(DNI), Cd:高压直流电(HVDC)和高压交流电(HVAC)的电气化/电网基础设施, CG:政治,战争,恐怖与安全状况)和287个预可行性投资阶段标准(例如 C:政府的超电网整合政策, CB1:通用Supergrid框架,立法和指令制定意愿, CB2:基于专家判断(3个语言变量和等权重平均白化)的权重结合经验曲线,在选定的授予标准的蜂窝中,通过灰色加权乘积法以语义聚类的形式,以语义聚类的形式提出了常见的超级电网输电法/法规制定意愿。单元,并基于专家判断(三角形模糊隶属函数中的3个语言变量,以及平均均值解模糊化等级)的简单决策相结合的简单决策加权方法,结合复杂聚类蜂窝单元的经验曲线。仅在1个层次级别(因子)中的11个标准和在4个层次级别(即主要因子,因子,1级子因子,2nd子因子)的287个语义分别在语义上聚在一起,以进行初步筛选和预可行性项目投资开发阶段。