当前位置: X-MOL 学术Flex. Serv. Manuf. J. › 论文详情
Our official English website, www.x-mol.net, welcomes your feedback! (Note: you will need to create a separate account there.)
A two-stage robust optimization approach for the berth allocation problem under uncertainty
Flexible Services and Manufacturing Journal ( IF 2.7 ) Pub Date : 2019-03-19 , DOI: 10.1007/s10696-019-09343-w
Changchun Liu , Xi Xiang , Li Zheng

This paper examines the berth allocation problem under uncertainty. We use uncertainty sets to describe the possible scenarios without depending on probabilistic information. Then we adopt a two-stage robust optimization approach where baseline schedule is made before and the recovery operation is made after the disruptions are known. Three two-stage robust models are constructed to generate less conservative solutions. Experimental results demonstrate that the schedule’s robustness can be improved with only a slight increase in the baseline cost. Finally, some management insights are presented based on the numerical results.

中文翻译:

不确定条件下泊位分配问题的两阶段鲁棒优化方法

本文研究了不确定性下的泊位分配问题。我们使用不确定性集来描述可能的情况,而不依赖于概率信息。然后,我们采用两阶段的鲁棒性优化方法,其中在确定中断之前先进行基线计划,并在知道中断后进行恢复操作。构建了三个两阶段的鲁棒模型以生成较不保守的解决方案。实验结果表明,只需稍微增加基准成本,就可以提高进度表的鲁棒性。最后,基于数值结果提出了一些管理见解。
更新日期:2019-03-19
down
wechat
bug