当前位置: X-MOL 学术IEEE Trans. Appl. Supercond. › 论文详情
Our official English website, www.x-mol.net, welcomes your feedback! (Note: you will need to create a separate account there.)
Construction and Test Results of Coil 2 of a Three-Coil 800-MHz REBCO Insert for the 1.3-GHz High-Resolution NMR Magnet
IEEE Transactions on Applied Superconductivity ( IF 1.8 ) Pub Date : 2017-06-01 , DOI: 10.1109/tasc.2016.2641341
Juan Bascuñán 1 , Philip Michael 2 , Seungyong Hahn 3 , Thibault Lecrevisse 4 , Yukikazu Iwasa 1
Affiliation  

This paper focuses on the construction and test results of Coil 2 that is a part of a trio of nested coils composing the REBCO 800-MHz insert. Upon its completion, the REBCO 800-MHz insert will be placed in the bore of a 500-MHz low-temperature superconducting nuclear magnetic resonance NMR magnet (L500) to form the MIT 1.3-GHz high-resolution NMR magnet. Coil 2 is a stack of 32 double-pancake (DP) coils wound with 6-mm-wide REBCO tape using the no-insulation technique. Each pancake is wound on a stainless steel inner supporting ring to prevent the collapsing of its crossover due to the external pressure exerted by the winding pack. Coil 2 will be constructed in the following sequence: 1) after winding, each DP will be individually tested in a bath of liquid nitrogen at atmospheric pressure to determine its current carrying capabilities; 2) DPs will be then assembled as a stack with interconnecting joints, and 3) as in Coil 1, each pancake will be overbanded with a stainless steel tape, this time to a thickness of 5 mm, thickness determined by a stress analysis previously performed. Finally, the fully assembled Coil 2 will be tested in liquid nitrogen at 77 K and then in liquid helium at 4.2 K. We present here details of the stress analysis leading to the sizing of the DP inner supporting stainless steel ring and of the overbanding thickness required. Test results include coil index, critical current, and charging time constant.

中文翻译:

用于 1.3-GHz 高分辨率 NMR 磁体的三线圈 800-MHz REBCO 插件的线圈 2 的构造和测试结果

本文重点介绍线圈 2 的构造和测试结果,线圈 2 是构成 REBCO 800-MHz 插件的三个嵌套线圈的一部分。完成后,REBCO 800-MHz 插件将被放置在 500-MHz 低温超导核磁共振 NMR 磁体 (L500) 的孔中,以形成 MIT 1.3-GHz 高分辨率 NMR 磁体。线圈 2 是由 32 个双薄饼 (DP) 线圈组成的堆栈,使用非绝缘技术用 6 毫米宽的 REBCO 胶带缠绕。每个薄饼都缠绕在不锈钢内支撑环上,以防止其交叉由于缠绕包施加的外部压力而坍塌。线圈 2 将按以下顺序构建: 1) 绕制后,每个 DP 将在大气压下的液氮浴中单独测试,以确定其载流能力;2) 然后将 DP 组装成具有互连接头的堆叠,以及 3) 与线圈 1 一样,每个薄饼将用不锈钢胶带包覆,这次厚度为 5 毫米,厚度由先前执行的应力分析确定. 最后,完全组装的线圈 2 将在 77 K 的液氮中进行测试,然后在 4.2 K 的液氦中进行测试。我们在此介绍导致 DP 内支撑不锈钢环尺寸和包边厚度的应力分析细节必需的。测试结果包括线圈指数、临界电流和充电时间常数。完全组装好的线圈 2 将在 77 K 的液氮中进行测试,然后在 4.2 K 的液氦中进行测试。我们在此详细介绍了导致 DP 内支撑不锈钢环尺寸和所需包带厚度的应力分析。测试结果包括线圈指数、临界电流和充电时间常数。完全组装好的线圈 2 将在 77 K 的液氮中进行测试,然后在 4.2 K 的液氦中进行测试。我们在此详细介绍了导致 DP 内支撑不锈钢环尺寸和所需包带厚度的应力分析。测试结果包括线圈指数、临界电流和充电时间常数。
更新日期:2017-06-01
down
wechat
bug