To read this content please select one of the options below:

Research on optimization of assembly line based on product scheduling and just-in-time feeding of parts

Hui Zhang (Mechanical and Electrical Engineering, Shihezi University, Shihezi, China and Engineering Research Center for Production Mechanization of Oasis Special Economic Crop, Ministry of Education, Shihezi, China)
Xiyang Li (Mechanical and Electrical Engineering, Shihezi University, Shihezi, China and Engineering Research Center for Production Mechanization of Oasis Special Economic Crop, Ministry of Education, Shihezi, China)
Za Kan (Mechanical and Electrical Engineering, Shihezi University, Shihezi, China and Engineering Research Center for Production Mechanization of Oasis Special Economic Crop, Ministry of Education, Shihezi, China)
Xiaohai Zhang (Mechanical and Electrical Engineering, Shihezi University, Shihezi, China)
Zhiyong Li (Shihezi Xinchangsheng Agricultural Machinery Co., Ltd., Shihezi, China)

Assembly Automation

ISSN: 0144-5154

Article publication date: 16 August 2021

Issue publication date: 22 September 2021

441

Abstract

Purpose

Reducing production auxiliary time is the key to improve the efficiency of the existing mixed-flow assembly line. This paper proposes a method combining improved genetic algorithm (GA) and Flexsim software. It also investigates mixed-flow assembly line scheduling and just-in-time (JIT) parts feeding scheme to reduce waste in production while taking the existing hill-drop mixed-flow assembly line as an example to verify the effectiveness of the method.

Design/methodology/approach

In this research, a method is presented to optimize the efficiency of the present assembly line. The multi-objective mathematical model is established based on the objective function of the minimum production cycle and part consumption balance, and the solution model is developed using multi-objective GA to obtain the mixed flow scheduling scheme of the hill-drop planter. Furthermore, modeling and simulation with Flexsim software are investigated along with the contents of line inventory, parts transportation means, daily feeding times and time points.

Findings

Theoretical analysis and simulation experiments are carried out in this paper while taking an example of a hill-drop planter mixed-flow assembly line. The results indicate that the method can effectively reduce the idle and overload of the assembly line, use the transportation resources rationally and decrease the accumulation of the line inventory.

Originality/value

The method of combining improved GA and Flexsim software was used here for the first time intuitively and efficiently to study the balance of existing production lines and JIT feeding of parts. Investigating the production scheduling scheme provides a reference for the enterprise production line accompanied by the quantity allocation of transportation tools, the inventory consumption of the spare parts along the line and the utilization rate of each station to reduce the auxiliary time and apply practically.

Keywords

Acknowledgements

Funding: Science and Technology Project of Shihezi City (Grant Number: 2019GY09). The Open Project of Engineering Research Center for Production Mechanization of Oasis Special Economic Crop, Ministry of Education(Grant Number: PMOC2021A02).

Conflicts of interest: The authors declare that they have no conflicts of interest to report regarding the present study.

Citation

Zhang, H., Li, X., Kan, Z., Zhang, X. and Li, Z. (2021), "Research on optimization of assembly line based on product scheduling and just-in-time feeding of parts", Assembly Automation, Vol. 41 No. 5, pp. 577-588. https://doi.org/10.1108/AA-12-2020-0196

Publisher

:

Emerald Publishing Limited

Copyright © 2021, Emerald Publishing Limited

Related articles