Introduction

Manufacturing requires higher physical conditions for workers than in other industries. These workers are exposed to harsh environments for a long time (e.g., high temperature, noise, harmful substances, germs), and often maintain long awkward postures for operations [9, 13, 31]. Although the manufacturing industry has introduced many automated equipment to replace repetitive actions, most of the manufacturing process’s operational tasks still require a lot of physical intervention. Therefore, the need for active risk assessment to reduce potential harm cannot be ignored [22].

According to the report of those who had an occupational accident in aluminum production between 2013 and 2019 prepared by the Social Security Institution (SSI) of Turkey, 94.4% of the people who had an occupational accident were men, and 5.6% were women. In addition, in 91.47% of occupational accidents, the person who had an accident started to work on the same day, while 8.53% became unavailable for two days or more. A total of 9441 occupational accidents have occurred between these years. For this reason, preventing occupational accidents, especially for the aluminum industry, will minimize life and economic losses (URL-1).

The development of risk assessment can be traced back to 40 years ago. It first conceptualized risk and then established a risk assessment model through quantitative or qualitative analysis approaches, which promoted risk assessment as a separate scientific field [40]. The main task of risk assessment is to use several assessment techniques to diagnose and discover the potential risks of specific activities and formulate improvement actions to suppress the occurrence of risks or delete the causes of risks [4]. In short, in the face of unknown risk events, decision makers hope to accurately grasp the potential risks and formulate appropriate preventive measures to control the damage caused by the risk events [29]. The current risk assessment methods can be divided into three categories: quantitative analysis, semi-qualitative–quantitative analysis, and qualitative analysis. Most researchers use semi-qualitative–quantitative analysis to explore occupational hazards in manufacturing because it is difficult to obtain a large amount of complete quantitative data on occupational accidents [34].

It is a feasible practice to assist the assessed event’s risk assessment through experts’ professional experience and judgment. Many academic studies have pointed out that expert-based risk assessment can obtain more effective and reliable results. Such a research concept forms a typical multicriteria decision-making (MCDM) problem [15, 19, 23,24,25, 29]. MCDM is one of the soft computing methods that convert qualitative information into quantitative analysis. In addition, it can also process qualitative and quantitative data simultaneously. MCDM does not require a large sample of survey data like the statistical theory. Rezaei et al. [33] pointed out that only needs four to ten experts to obtain reliable information for the MCDM process. Of course, it is necessary to ensure that the interviewed experts are highly relevant and professional. In usual qualitative accurate decision-making issues, it is an unrealistic hypothesis that a decision maker’s judgment is so precise in effectively measuring experts’ opinions and considering the uncertainty of the evaluation environment. Many studies have applied the fuzzy-based MCDM model to discuss risk assessment issues in manufacturing [15, 19, 21]. For example, applying the fuzzy VIKOR (visekriterijumska optimizacija i kompromisno resenje) in project evaluation for safe route of voice traffic [2], using rough TOPSIS (technique for order preference by similarity to ideal solution) in reliability appraisal of machine tools, [29], employed fuzzy DEMATEL (decision-making trial and evaluation laboratory) in the supply chain’s safety assessment [30]. Moreover, some miscellaneous occupational health and safety risk assessment models are released in the recent literature using MCDM methods along with fuzzy sets (26, 27, 28); [6, 10, 15, 17, 19, 45,46,47].

Some variant fuzzy theories have gradually been proposed to replace conventional fuzzy theory, such as intuitionistic fuzzy sets (IFs) (3) and Pythagorean fuzzy sets (PFs) [43], which are used to more accurately reflect the semantics of experts. A novel fuzzy logic, called Fermatean fuzzy sets (FFSs), was proposed by Senapati and Yager [37]. FFSs enhance the ability to measure uncertainty compared to IFs and PFs. The scope of information uncertainty covered by FFs is broader, which is instrumental in avoiding potential information missed in qualitative conversion to quantification. However, existing risk assessment techniques have not incorporated FFs into the MCDM model. This study proposes a new risk assessment model for occupational risk assessment in manufacturing. A new FF-TOPSIS approach in this model considers the uncertainty of the evaluated events and measures the degree of membership and non-membership in the assessment process. During the execution of FF-TOPSIS, the reference points for distance calculation include positive and negative ideal solutions (PIS and NIS), which can obtain more potential information than many other MCDM methods (e.g., simple additive weighting (SAW), weighted aggregated sum product assessment (WASPAS), multi-objective optimization based on ratio analysis (MOORA), and additive ratio assessment (ARAS)). Because FF-TOPSIS can determine the distance between each evaluated item and PIS and NIS. In addition, this approach provides a complete linguistic assessment level and FFSs membership functions.

The FF-TOPSIS approach can be used to obtain the relative closeness index of each hazard and priority them, which can be applied to formulate the appropriate improvement measures of occupational risk for the manufacturing industry. This study collected real-world data from a Turkish aluminum plate-manufacturing company to demonstrate the practicality and effectiveness of the proposed approach. Senapati and Yager [37] prove that FFSs are superior to IFs and PFs, but it has not yet confirmed the difference between grey and conventional (crisp) fuzzy theories. Therefore, this study also compares crisp TOPSIS, grey TOPSIS, and general fuzzy TOPSIS techniques. The results show that the proposed approach improves the above three techniques’ limitations, thereby more accurately transforming expert opinions into computable quantitative data. The characteristics of this paper are summarized below.

  1. (i)

    The proposed risk assessment model brings a new framework for occupational risk assessment in manufacturing.

  2. (ii)

    This study identifies and discusses 12 sections of the factory and their 85 potential hazards in the aluminum manufacturing in Turkey.

  3. (iii)

    The FF-TOPSIS approach determines the relative closeness index of each hazard and prioritizes the 85 potential hazards.

  4. (iv)

    The results of this study can support practitioners and risk analysts in formulating improvement measures.

  5. (v)

    The execution of the model comparison illustrates the advantages of the proposed model.

The remainder of this paper is organized as follows. The next section presents a literature review of manufacturing risk assessment and FFSs, and then explains the research gaps. The third section introduces the FF-TOPSIS methodology and the proposed risk assessment model. The fourth section presents a case study to illustrate the practicality and effectiveness of the proposed model. Then, some discussions and execution model comparisons are provided. The last section summarizes the conclusions and provides suggestions for future research.

Literature review

In this section, a brief overview of previous studies regarding manufacturing risk assessment and FFSs are provided. Then, the research gap and contributions are given in the lights of both reviews.

Review of manufacturing risk assessment

The issues related to occupational health and safety in the workplace environment have always been problems faced by companies. To improve workplace safety and reduce accident rates, these issues must be considered for the sake of improving companies’ operations [16]. According to Berhan [7], there are about 268 million work-related diseases and non-fatal workplace accidents worldwide every year. It is an important task to actively examine and evaluate workers’ workplace safety issues, otherwise, work efficiency and the social economy will be affected. Since the manufacturing industry requires workers to be highly involved in production operations, it has become one of the industries with the highest frequency of occupational accidents [13].

The risk assessment process is applied to determine risk improvement priorities by assessing the rating of risks. Existing quantitative, semi-qualitative–quantitative, and qualitative and hybrid risk assessment approaches are used in various manufacturing industries [34]. Take research on occupational safety, for example, Dabbagh and Yousefi [11] proposed a three-stage model for identifying auto-parts manufacturing companies’ occupational health and safety. First, they use the failure mode and effect analysis (FMEA) to identify potential risks. The evaluation criteria used include severity, occurrence, detection, cost, and time, and then fuzzy cognitive map (FCM) is used to assign the weights of the criteria. Finally, the first two stages’ output data are used as an assessment matrix, and MOORA is used to determine the priority of risks. Li et al. [22] developed an improved physical demand analysis (PDA) for manufacturing. Their proposed risk analysis framework focuses on ergonomic risk assessment, identification, control, and mitigation. Rezaee et al. [32] employed a risk analysis in the chemical industry from the health, safety and environmental perspectives. Their model includes FMEA, fuzzy inference system and fuzzy DEA. Gul et al. [18] performed an improved version of Fine–Kinney method with hexagonal fuzzy sets and MULTIMOORA to assess risks in a cement manufacturing plant. Delice and Can [12] carried out an ergonomic risk assessment for the tube manufacturing industry. In their study, Modified Kemeny Median Indicator Ranks Accordance (KEMIRA-M) and a novel two-dimensional best–worst method (BWM) are integrated for weighting ergonomic risk criteria. Then, the rankings of workers were determined via MOORA.

Focusing on the systems or products, Braglia et al. [8] established a risk failure deployment (RFD) tool to analyze the train access door’s installation process. RFD is used to detect the most critical failure modes and provides practical step-by-step guidance for risk analysts to eliminate/mitigate/control risk root causes. Lo et al. [29] developed a hybrid MCDM risk assessment framework to provide a reliability analysis tool for the machine tool manufacturing. Their study integrates rough set theory, BWM, and TOPSIS to explore and review the potential causes of product failure. Ali et al. [2] performed a risk assessment of China–Pakistan fiber optic project using fuzzy VIKOR method. Their research proposes strategies to increase the fiber optic project’s security and reliability between China and Pakistan. The above studies have made many breakthroughs and contributions to the risk assessment of manufacturing.

Review of Fermatean fuzzy sets

Since this type of fuzzy sets are recently developed [37], there are limited papers in the literature on the theoretical improvement of FFSs or applying this set to a real-world problem. In the first study of FFSs, Senapati and Yager [37] compared FFSs with PFSs and IFs. Mathematical operators and fundamental set of operations for this type of fuzzy sets are defined as well as score and accuracy functions for ranking. In addition, in the first paper, the computation of Euclidean distance is explained. Following the first study, it is applied to MCDM problems [1, 5, 14, 23, 24, 35, 36, 42], 1. Moreover, Sergi and Sari [38] applied FFSs to engineering economics problems. Fuzzy capital budgeting methods, including fuzzy net present worth, fuzzy net future worth and fuzzy net annual worth are extended using FFSs with some illustrative calculations Sergi and Sari [38]. From theoretical aspects, Silambarasan [39] suggested new operators for FFSs. While Liu et al. [23] proposed Fermatean fuzzy linguistic set and applied it to the MCDM problems. Liu et al. [24] focus on distance measure for Fermatean fuzzy linguistic term sets based on linguistic scale function.

From this short literature review, it can be easily inferred that applications of this type of fuzzy sets to the MCDM problems are in progress. In this regard, implementing FFSs integrated with MCDM methods to any real-life problems has gained importance. Therefore, in this study, we aim to apply Fermatean fuzzy TOPSIS in the manufacturing risk assessment problem.

Research gap and contributions

The provided short literature reviews on both manufacturing risk assessment and FFSs reveal that fuzzy set extension and MCDM in the risk assessment domain have several pluses. In this regard, the following contributions are pointed out from this study to the current literature.

  1. (i)

    FFSs in TOPSIS (with MCDM concept) have been implemented in a real-life occupational risk assessment problem for manufacturing in the literature. Considering the risk assessment’s width (from occupational health and safety perspective to financial risk assessment), this study will lead future studies in this field.

  2. (ii)

    For FF-TOPSIS computations, a new linguistic scale under Fermatean fuzzy documentation has also been developed for experts to disclose their judgments easily. The scope of information uncertainty covered by Fermatean fuzzy is broader than that conventional fuzzy, intuitionistic fuzzy, and Pythagorean fuzzy, which is instrumental in avoiding potential information missed in qualitative conversion to quantification. Scholars may benefit from this scale in future studies. In addition, FF-TOPSIS uses PIS and NIS as the reference points for distance calculation, which can obtain more potential information.

  3. (iii)

    Practitioners in the industry can adapt the case application presented in this study for their risk assessment processes. From this point, a good practice is demonstrated with detailed steps from expert judgments to risk preventive measure suggestions.

  4. (iv)

    A comparative analysis is provided to test the solidity of the proposed approach. To do this, crisp TOPSIS, fuzzy TOPSIS, and grey TOPSIS are applied to the problem. Their analysis results are not exactly the same as FF-TOPSIS. Since the FFs measure both the membership and non-membership, but crisp, fuzzy, and grey theories only consider the membership.

Methodology

In this section, preliminaries of FFS are introduced. Then, procedural steps of FF-TOPSIS are presented with its descriptive formulations.

Preliminaries on Fermatean fuzzy sets (FFSs)

Definition 1

Let X be universe of discourse. A FFS \(\mathcal{F}\) in X is an object having the form

$$\mathcal{F}=\left\{\langle x,{\mu }_{F}\left(x\right), {\vartheta }_{F}(x)\rangle :x \in X\right\},$$

where \({\mu }_{F}\left(x\right):X\to \left[\mathrm{0,1}\right]\) and \({\vartheta }_{F}\left(x\right):X\to \left[\mathrm{0,1}\right]\) including the condition.

$$0\le {\left({\mu }_{F}\left(x\right)\right)}^{3}+{\left({\vartheta }_{F}\left(x\right)\right)}^{3}\le 1.$$

For all \(x\in X.\) The \({\mu }_{F}\left(x\right)\) and \({\vartheta }_{F}\left(x\right)\) refer to the degree of membership and non-membership of the element x in the set \(\mathcal{F},\) respectively.

For any FFS \(\mathcal{F}\) and \(x \in X,\)

$${\pi }_{F}\left(x\right)=\sqrt[3]{1-{\left({\mu }_{F}\left(x\right)\right)}^{3}+{\left({\vartheta }_{F}\left(x\right)\right)}^{3}},$$

can be identified as the degree of indeterminacy of x to \(\mathcal{F}.\)

Demonstration of a comparison between intuitionistic, Pythagorean, and FFSs is as in Fig. 1. Intuitionistic membership grades (IMGs) are all points beneath the \(\mu \left(x\right)+\vartheta \left(x\right)\le 1\). Pythagorean membership grades (PMGs) are all point with \({\left({\mu }_{P}\left(x\right)\right)}^{2}+{\left({\vartheta }_{P}\left(x\right)\right)}^{2}\le 1\) and the Fermatean membership grades (FMGs) are all point \({\left({\mu }_{F}\left(x\right)\right)}^{3}+{\left({\vartheta }_{F}\left(x\right)\right)}^{3}\le 1\). FMGs allow higher non-membership grades than both IMGs and PMGs.

Fig. 1
figure 1

A comparative demonstration of three membership grades

For a more straightforward usage, we will use the symbol \(\mathcal{F}=({\mu }_{F},{\vartheta }_{F})\) for the FFS \(\mathcal{F}=\left\{\langle x,{\mu }_{F}\left(x\right), {\vartheta }_{F}(x)\rangle :x \in X\right\}.\)

Definition 2

Let \({\mathcal{F}=(\mu }_{F}, {\vartheta }_{F}),\) \({{\mathcal{F}}_{1}=(\mu }_{{F}_{1}}, {\vartheta }_{{F}_{1}})\) and \({{\mathcal{F}}_{2}=(\mu }_{{F}_{2}}, {\vartheta }_{{F}_{2}})\) be three FFSs, then some operations are defined as below:

  1. (i)

    \({\mathcal{F}}_{1}\cap {\mathcal{F}}_{2}=(\mathrm{min}\left\{{\mu }_{{F}_{1}},{\vartheta }_{{F}_{2}}\right\},\mathrm{max}\left\{{\vartheta }_{{F}_{1}},{\vartheta }_{{F}_{2}}\right\});\)

  2. (ii)

    \({\mathcal{F}}_{1}\cup {\mathcal{F}}_{2}=(\mathrm{max}\left\{{\mu }_{{F}_{1}},{\vartheta }_{{F}_{2}}\right\},\mathrm{min}\left\{{\vartheta }_{{F}_{1}},{\vartheta }_{{F}_{2}}\right\});\)

  3. (iii)

    \({\mathcal{F}}^{c}={(\vartheta }_{F},{\mu }_{F}).\)

Definition 3

Let \({\mathcal{F}=(\mu }_{F}, {\vartheta }_{F}),\) \({{\mathcal{F}}_{1}=(\mu }_{{F}_{1}}, {\vartheta }_{{F}_{1}})\) and \({{\mathcal{F}}_{2}=(\mu }_{{F}_{2}}, {\vartheta }_{{F}_{2}})\) be three FFSs and \(\lambda >0\), then some mathematical operations are formulized as below:

  1. (i)

    \({\mathcal{F}}_{1}\boxplus {\mathcal{F}}_{2}=\left(\sqrt[3]{{{\mu }_{{F}_{1}}}^{3}+{{\mu }_{{F}_{2}}}^{3}-{{\mu }_{{F}_{1}}}^{3}{{\mu }_{{F}_{2}}}^{3}}, {\vartheta }_{{F}_{1}}{\vartheta }_{{F}_{2}}\right)\);

  2. (ii)

    \({\mathcal{F}}_{1}\boxtimes {\mathcal{F}}_{2}=\left({\mu }_{{F}_{1}}{\mu }_{{F}_{2}},\sqrt[3]{{{\vartheta }_{{F}_{1}}}^{3}+{{\vartheta }_{{F}_{2}}}^{3}-{{\vartheta }_{{F}_{1}}}^{3}{{\vartheta }_{{F}_{2}}}^{3}}\right)\);

  3. (iii)

    \(\lambda \mathcal{F}=\left(\sqrt[3]{1-{\left(1-{{\mu }_{F}}^{3}\right)}^{\lambda }},{{\vartheta }_{F}}^{\lambda }\right)\);

  4. (iv)

    \({\mathcal{F}}^{\lambda }=\left({{\mu }_{F}}^{\lambda },\sqrt[3]{1-{\left(1-{{\vartheta }_{F}}^{3}\right)}^{\lambda }}\right)\).

Another important point in FFSs is the ranking of two Fermatean fuzzy numbers. For this, a score function computation is given as in Definition 4.

Definition 4

Let \({\mathcal{F}=(\mu }_{F}, {\vartheta }_{F})\) be a FFS, then the score function of \(\mathcal{F}\) is as follows: \(\mathrm{score}\left(\mathcal{F}\right)={{\mu }_{F}}^{3}-{{\vartheta }_{F}}^{3}\)

For any FFS \({\mathcal{F}=(\mu }_{F}, {\vartheta }_{F})\), the proposed score function \(\mathrm{score}\left(\mathcal{F}\right)\in [-\mathrm{1,1}]\)

Definition 5

Let \({{\mathcal{F}}_{1}=(\mu }_{{F}_{1}}, {\vartheta }_{{F}_{1}})\) and \({{\mathcal{F}}_{2}=(\mu }_{{F}_{2}}, {\vartheta }_{{F}_{2}})\) be two FFSs, a natural quasi-ordering is as below:

\({\mathcal{F}}_{1}\ge {\mathcal{F}}_{2}\) if and only if \({\mu }_{{F}_{1}}\ge {\mu }_{{F}_{2}}\) and \({\vartheta }_{{F}_{1}}\le {\vartheta }_{{F}_{2}}\)

In Definitions 6 and 7, the relation between FFSs is defined.

Definition 6

Let \({{\mathcal{F}}_{1}=(\mu }_{{F}_{1}}, {\vartheta }_{{F}_{1}})\) and \({{\mathcal{F}}_{2}=(\mu }_{{F}_{2}}, {\vartheta }_{{F}_{2}})\) be two FFSs, \(score\left({\mathcal{F}}_{1}\right)\) and \(\mathrm{score}\left({\mathcal{F}}_{2}\right)\) be score function of \({\mathcal{F}}_{1}\) and \({\mathcal{F}}_{2},\) respectively, then

  1. 1.

    If \(\mathrm{score}\left({\mathcal{F}}_{1}\right)<\mathrm{score}\left({\mathcal{F}}_{2}\right)\), then \({\mathcal{F}}_{1}<{\mathcal{F}}_{2}\);

  2. 2.

    If \(\mathrm{score}\left({\mathcal{F}}_{1}\right)>\mathrm{score}\left({\mathcal{F}}_{2}\right)\), then \({\mathcal{F}}_{1}>{\mathcal{F}}_{2}\);

  3. 3.

    If \(\mathrm{score}\left({\mathcal{F}}_{1}\right)=\mathrm{score}\left({\mathcal{F}}_{2}\right)\), then \({\mathcal{F}}_{1}\sim {\mathcal{F}}_{2}\);

Definition 7

Let \({\mathcal{F}=(\mu }_{F}, {\vartheta }_{F}),\) be an FFS, then an accuracy function is computed as below:

$$\mathrm{acc}\left(\mathcal{F}\right)={{\mu }_{F}}^{3}+{{\vartheta }_{F}}^{3}.$$

Clearly \(acc\left(\mathcal{F}\right)\in [\mathrm{0,1}]\). In fact

$$0\le \mathrm{acc}\left(\mathcal{F}\right)={{\mu }_{F}}^{3}+{{\vartheta }_{F}}^{3}\le 1.$$

Definition 8

Let \({{\mathcal{F}}_{1}=(\mu }_{{F}_{1}}, {\vartheta }_{{F}_{1}})\) and \({{\mathcal{F}}_{2}=(\mu }_{{F}_{2}}, {\vartheta }_{{F}_{2}})\) be two FFSs, \(\mathrm{score}\left({\mathcal{F}}_{i}\right)\) and \(\mathrm{acc}\left({\mathcal{F}}_{i}\right)\) \((i=\mathrm{1,2})\) are given for \({\mathcal{F}}_{1}\) and \({\mathcal{F}}_{2},\) respectively, then

  1. 1.

    If \(\mathrm{score}\left({\mathcal{F}}_{1}\right)<\mathrm{score}\left({\mathcal{F}}_{2}\right)\), then \({\mathcal{F}}_{1}<{\mathcal{F}}_{2}\);

  2. 2.

    If \(\mathrm{score}\left({\mathcal{F}}_{1}\right)>\mathrm{score}\left({\mathcal{F}}_{2}\right)\), then \({\mathcal{F}}_{1}>{\mathcal{F}}_{2}\);

  3. 3.

    If \(\mathrm{score}\left({\mathcal{F}}_{1}\right)=\mathrm{score}\left({\mathcal{F}}_{2}\right)\), then

    1. (i)

      If \(\mathrm{acc}\left({\mathcal{F}}_{1}\right)<\mathrm{acc}\left({\mathcal{F}}_{2}\right)\), then \({\mathcal{F}}_{1}<{\mathcal{F}}_{2}\);

    2. (ii)

      If \(\mathrm{acc}\left({\mathcal{F}}_{1}\right)>\mathrm{acc}\left({\mathcal{F}}_{2}\right)\), then \({\mathcal{F}}_{1}>{\mathcal{F}}_{2}\);

    3. (iii)

      If \(\mathrm{acc}\left({\mathcal{F}}_{1}\right)=\mathrm{acc}\left({\mathcal{F}}_{2}\right)\), then \({\mathcal{F}}_{1}={\mathcal{F}}_{2}\);

Definition 9

Let \({{\mathcal{F}}_{1}=(\mu }_{{F}_{1}}, {\vartheta }_{{F}_{1}})\) and \({{\mathcal{F}}_{2}=(\mu }_{{F}_{2}}, {\vartheta }_{{F}_{2}})\) be two FFSs. The Euclidean distance between \({\mathcal{F}}_{1}\) and \({\mathcal{F}}_{2}\) is

$$d\left({\mathcal{F}}_{1},{\mathcal{F}}_{2}\right)=\sqrt{1/ 2\left[{{{(\mu }_{{F}_{1}}}^{3}-{{\mu }_{{F}_{2}}}^{3})}^{2}+{({{\vartheta }_{{F}_{1}}}^{3}-{{\vartheta }_{{F}_{2}}}^{3})}^{2}+{({{\pi }_{{F}_{1}}}^{3}-{{\pi }_{{F}_{2}}}^{3})}^{2}\right]}.$$

Fermatean fuzzy technique for order preference by similarity to ideal solution (FF-TOPSIS)

FF-TOPSIS includes the following five steps in the problem.

Step 1::

For an MCDM problem with Fermatean fuzzy numbers (FFNs), we formulate the Fermatean risk assessment matrix \(R={({C}_{j}\left({S}_{i}\right))}_{mxn}\) with Eq. (1) where \({C}_{j}\left({S}_{i}\right) (j=\mathrm{1,2},\dots ,n i=\mathrm{1,2},\dots ,m)\) refers to the hazard \({S}_{i}\in X\) regarding the risk parameter \({C}_{j}\in C.\)

\(w={\left({w}_{1},{w}_{2},\dots , {w}_{n}\right)}^{T}\) demonstrates the risk parameters weights with \(0\le {w}_{j}\le 1\), \(j=\mathrm{1,2},\dots ,n\) and \({\sum }_{j=1}^{n}{w}_{j}=1\). We show the performance value of the hazard \({S}_{i}\) with respect to the risk parameter \({C}_{j}\) by \({C}_{j}\left({S}_{i}\right)=({\mathcal{U}}_{ij},{v}_{ij})\).

$$R={({C}_{j}\left({S}_{i}\right))}_{mxn}=\begin{array}{c} \\ {S}_{1}\\ {S}_{1}\\ \vdots \\ {S}_{m}\end{array}\left(\begin{array}{cccc}{C}_{1}& {C}_{2}& \dots & {C}_{n}\\ {(\mu }_{11},{v}_{11})& {(\mu }_{12},{v}_{12})& \dots & {(\mu }_{1n},{v}_{1n})\\ {(\mu }_{21},{v}_{21})& {(\mu }_{22},{v}_{22})& \dots & {(\mu }_{2n},{v}_{2n})\\ \vdots & \vdots & \ddots & \dots \\ {(\mu }_{m1},{v}_{m1})& {(\mu }_{m3},{v}_{m3})& \dots & {(\mu }_{mn},{v}_{mn})\end{array}\right)$$
(1)
Step 2::

By Eqs. (2) and (3), the Fermatean fuzzy positive ideal solution (FFPIS) \({S}^{+}=\left\{{C}_{1}\left({S}^{+}\right),{C}_{2}\left({S}^{+}\right),\dots ,{C}_{n}\left({S}^{+}\right)\right\}\) and the Fermatean fuzzy negative ideal solution (FFNIS) \({S}^{-}=\left\{{C}_{1}\left({S}^{-}\right),{C}_{2}\left({S}^{-}\right),\dots ,{C}_{n}\left({S}^{-}\right)\right\}\) are determined.

$$\begin{aligned}{S}^{+} &=\left\{\begin{array}{l}\underset{i}{\mathrm{max}}\langle \mathrm{score}\left({C}_{j}({S}_{i})\right)\rangle \left|\quad j=\mathrm{1,2},\dots ,n\right.\\ \text{ if }{c}_{j}\text{ is benefit criterion}\\ \underset{i}{\mathrm{min}}\langle \mathrm{score}\left({C}_{j}({S}_{i})\right)\rangle \left|\quad j=\mathrm{1,2},\dots ,n\right.\\ \text{ if }{c}_{j}\text{ is a cost criterion}\end{array}\right.\\ {S}^{+}& =\left\{\left({\mu }_{1}^{+},{v}_{1}^{+}\right),\left({\mu }_{2}^{+},{v}_{2}^{+}\right),\dots ,\left({\mu }_{n}^{+},{v}_{n}^{+}\right)\right\}.\end{aligned}$$
(2)
$$\begin{aligned}{S}^{-} & =\left\{\begin{array}{l}\underset{i}{\mathrm{min}}\langle \mathrm{score}\left({C}_{j}({S}_{i})\right)\rangle \left| \quad j=\mathrm{1,2},\dots ,n\right.\\ \text{ if }{c}_{j}\text{ is benefit criterion}\\ \underset{i}{\mathrm{max}}\langle \mathrm{score}\left({C}_{j}({S}_{i})\right)\rangle \left|\quad j=\mathrm{1,2},\dots ,n\right.\\\text{ if}{c}_{j}\text{ is a cost criterion}\end{array}\right. \\ {S}^{-}& =\left\{\left({\mu }_{1}^{-},{v}_{1}^{-}\right),\left({\mu }_{2}^{-},{v}_{2}^{-}\right),\dots ,\left({\mu }_{n}^{-},{v}_{n}^{-}\right)\right\}.\end{aligned}$$
(3)
Step 3::

Distances from FFPIS and FFNIS are computed using Eqs. (4) and (5), respectively:

$$\begin{aligned} D\left({S}_{i},{S}^{+}\right) & =\sum_{j=1}^{n}{w}_{j}d\left({C}_{j}\left({S}_{i}\right),{C}_{j}({S}^{+})\right)\\ D\left({S}_{i},{S}^{+}\right) &=\sum_{j=1}^{n}{w}_{j}\sqrt{\frac{1}{2}\left[{\left({{\mu }_{ij}}^{3}-{({\mu }_{j}^{+})}^{3}\right)}^{2}+{\left({{\vartheta }_{ij}}^{3}-{({\vartheta }_{j}^{+})}^{3}\right)}^{2}+\left({{\pi }_{ij}}^{3}-{({\pi }_{j}^{+})}^{3}\right)\right]} \\ i & =\mathrm{1,2},\dots ,m.\end{aligned}$$
(4)
$$\begin{aligned}D\left({S}_{i},{S}^{-}\right) & =\sum_{j=1}^{n}{w}_{j}d\left({C}_{j}\left({S}_{i}\right),{C}_{j}({S}^{-})\right) \\ D\left({S}_{i},{S}^{-}\right) & =\sum_{j=1}^{n}{w}_{j}\sqrt{\frac{1}{2}\left[{\left({{\mu }_{ij}}^{3}-{({\mu }_{j}^{-})}^{3}\right)}^{2}-{\left({{\vartheta }_{ij}}^{3}-{\left({\vartheta }_{j}^{-}\right)}^{3}\right)}^{2}-\left({{\pi }_{ij}}^{3}-{({\pi }_{j}^{-})}^{3}\right)\right].}\end{aligned}$$
(5)
Step 4::

By Eq. (6), revised closeness \(\xi \left({S}_{i}\right)\) of each hazard \({S}_{i}\) \(i=\mathrm{1,2},\dots ,m)\) is computed:

$$\xi \left({S}_{i}\right)=\frac{D\left({S}_{i},{S}^{-}\right)}{{D}_{\mathrm{max}}\left({S}_{i},{S}^{-}\right)}-\frac{D\left({S}_{i},{S}^{+}\right)}{{D}_{\mathrm{min}}\left({S}_{i},{S}^{+}\right)}.$$
(6)
Step 5::

The revised closeness \(\xi \left({S}_{i}\right)\) in Step 4 is used to decide the order of hazards and to identify suitable hazards. \(\xi \left({S}_{i}\right)\) values are listed in descending order. The risk parameter with the highest \(\xi \left({S}_{i}\right)\) value is determined, and ranking is made:

$${S}^{*}=\left\{{S}_{i}:(i:\xi \left({S}_{i}\right)=\underset{1\le l\le m}{\mathrm{max}}\xi \left({x}_{l}\right)\right\}.$$
(7)

Proposed risk assessment model

The procedural steps of the proposed risk assessment model are given in Fig. 2. There are two main phases as follows: (1) pre-assessment phase, which includes determination of potential hazards and deciding on both weights for risk parameters and experts, and (2) application of risk assessment by FF-TOPSIS.

Fig. 2
figure 2

Procedural steps in the proposed risk assessment model

The pre-assessment phase contains determination of the following arguments: (1) the definition of the problems (aluminum plate-manufacturing process risk assessment), (2) risk parameters (probability and severity), (3) hazard list (a total of 85 hazards in 12 different sections of the plant), (4) OHS expert, and (5) linguistic terms with their corresponding Fermatean fuzzy numbers. The application phase demonstrates the implementation of FF-TOPSIS to determine the ranking of hazards and associated risks. The experts define the risk assessment problem considering these dimensions. A unit-based hazard list is created. There are 12 sections as casting section, casting lines, carpentry workshop, finished goods stock section, production section, packing section, slicing section, sizing section, washing and stretching section, cold rolling section, technical maintenance section, and factory site. Which risk parameters will be used in risk assessment and what their weight will be are determined according to the expert opinions and the literature. Two parameters named probability and severity are considered for the approach by assigning a weight of 60% and 40% for each one, respectively. Another crucial dimension in the pre-assessment phase is the OHS expert profile and their weight coefficient determination. The weight coefficient assignment procedure followed in the proposed approach is adapted from the literature. It is based on some characteristics such as their job title, educational sage, age, and experience (related to OHS and aluminum production). As the last dimension of the pre-assessment, the approach uses a scale with linguistic terms and their corresponding Fermatean fuzzy numbers. The scale is developed by the authors considering general natural quasi-ordering rules of Fermatean fuzzy sets.

The application phase of risk assessment via FF-TOPSIS also has five sub-steps. Initially, Fermatean fuzzy decision matrix for each expert is aggregated. Second, FFPIS and FFNIS values are computed. In the third sub-step, distance is calculated from both FFPIS and FFNIS. In the fourth and final sub-steps, respectively, revised closeness coefficient (special for the FF-TOPSIS) is obtained for each hazard and ranking is ordered.

Case study

This case study section is divided into four subsections. First, the studied aluminum plate-manufacturing process is introduced. Then, in the second subsection, the hazard and risk identification is addressed. In the third subsection, the implementation of the approach in a manufacturing process is handled. Finally, a comparative study between the results of this study and some benchmarking studies is performed.

Studied aluminum plate-manufacturing process

A case study in an aluminum plate-manufacturing plant is performed to demonstrate the proposed risk assessment model. The observed plant provides high-quality products for domestic and foreign sectors such as automotive, durable goods, electronics, construction, packaging, and energy. The production facility has a high annual production capacity for plain coil and strip, embossed coil and strip, and plain or embossed coil aluminum production. The plant’s production lines offer a wide portfolio of products from thickness to widths with various packaging forms that correspond to their specific needs and requirements.

Hazard and risk identification

The proposed risk assessment model aims to effectively minimize the consequences of hazards and suggest preventive measures in mitigating risks. In this case study, the proposed model’s 85 hazards and related risks in 12 different sections of the observed plant are evaluated under 2 risk parameters. The risk parameters are described as follows: “Probability” is defined regarding the occurrence of the risk occurring as a result of the hazard. “Severity” is defined as the most probable results of a potential accident, including injuries and property damages. Detailed information regarding the identification of each hazard is given in Table 1. They are encoded with different IDs so that it is related to the section where it emerged. They are assessed under 12 different sections inside the plant. These sections are presented in Fig. 2.

Table 1 Hazard list

Five experts with almost the same expertise levels in the aluminum plate-manufacturing industry performed the evaluations. A description of the experts’ profiles can be found in Table 2.

Table 2 Description of experts participating in the decision-making team

In particular, these experts were selected considering their job title, educational sage, age, and experience (related to OHS and aluminum production). In this study’s risk assessment phase, it is required to use the importance weights of experts. Therefore, the priority weights of experts are calculated using a procedure from the literature. Considering these rules of Kabir et al. [20] and Yazdi [44], a fixed weight coefficient of 0.2 is assigned for each one as in Table 3.

Table 3 The weight determination of experts

The linguistic terms and corresponding Fermatean fuzzy numbers used in the ranking of hazards are given in Table 4.

Table 4 Fermatean fuzzy scale for hazard ranking

Implementation of the approach to the manufacturing process

In the implementation of the approach, FF-TOPSIS procedural steps given in “Fermatean fuzzy technique for order preference by similarity to ideal solution (FF-TOPSIS)” are followed. Using the linguistic terms given in Table 2 by five experts, first, we obtain the aggregated Fermatean risk assessment matrix. We separately applied FF-TOPSIS for the hazards that emerged at each unit. Therefore, the obtained results are demonstrated according to the unit-based structure. As an example of obtaining the initial aggregated Fermatean risk assessment matrix for “Casting section” hazards, the computations are made in Fig. 3. Fermatean fuzzy weighted average operator, as indicated by Senapati and Yager [35], is applied to obtain an aggregated values of experts in a single decision matrix. After this step, using Eqs. (2, 3), FFPIS, and FFNIS values are calculated. To do this, score functions of each hazard (TO1, TO2, TO3, TO4, TO5 and TO6) are computed as in Definition 4 in “Preliminaries on Fermatean fuzzy sets (FFSs)”. The score function values of each hazard with respect to the probability parameter are as follows:

$$\mathrm{score}\left(\mathrm{TO}1\right)={(0.512)}^{3}-{\left(0.920\right)}^{3}=-0.644,$$
$$\mathrm{score}\left(\mathrm{TO}2\right)={(0.586)}^{3}-{\left(0.836\right)}^{3}=-0.383,$$
$$\mathrm{score}\left(\mathrm{TO}3\right)={(0.828)}^{3}-{\left(0.634\right)}^{3}=0.313,$$
$$\mathrm{score}\left(\mathrm{TO}4\right)={(0.514)}^{3}-{\left(0.914\right)}^{3}=-0.628,$$
$$\mathrm{score}\left(\mathrm{TO}5\right)={(0.890)}^{3}-{\left(0.470\right)}^{3}=0.601,$$
$$\mathrm{score}\left(\mathrm{TO}6\right)={(0.710)}^{3}-{\left(0.774\right)}^{3}=-0.106.$$

Similarly, the score function values of each hazard with respect to severity parameter are calculated as follows (Fig. 3):

Fig. 3
figure 3

Demonstration of computation procedure for the aggregated Fermatean risk assessment matrix (regarding assessing “Casting section” hazards)

$$\mathrm{score}\left(\mathrm{TO}1\right)={(0.732)}^{3}-{\left(0.722\right)}^{3}=0.016,$$
$$\mathrm{score}\left(\mathrm{TO}2\right)={(0.690)}^{3}-{\left(0.820\right)}^{3}=-0.223,$$
$$\mathrm{score}\left(\mathrm{TO}3\right)={(0.756)}^{3}-{\left(0.712\right)}^{3}=0.071,$$
$$\mathrm{score}\left(\mathrm{TO}4\right)={(0.752)}^{3}-{\left(0.656\right)}^{3}=0.143,$$
$$\mathrm{score}\left(\mathrm{TO}5\right)={(0.828)}^{3}-{\left(0.634\right)}^{3}=0.313,$$
$$\mathrm{score}\left(\mathrm{TO}6\right)={(0.920)}^{3}-{\left(0.510\right)}^{3}=0.646.$$

From the score functions, using Eqs. (23), \({S}^{+}\) and \({S}^{-}\) values are obtained as follows:

$${S}^{+}=\left\{\left(0.890, 0.470\right),\left(0.920, 0.510\right)\right\},$$
$${S}^{-}=\left\{\left(0.512, 0.920\right),\left(0.690, 0.820\right)\right\}.$$

Then, using Eqs. (46), distances from FFPIS and FFNIS and final revised closeness values are obtained as in Table 5. According to the results, hazard “TO5: Spread of slag dust” has the most crucial one among six emerged hazards related to the casting section operations. It has a closeness value of zero. It is followed by the hazard of “TO3: Fire caused by overheating inside the cabinet” with a final revised closeness index value of − 2.269. The third place in the ranking is “TO6: Opening the cabinet door inwards” with a closeness value of − 2.392. The remaining ranking order is TO2 (− 6.621), TO4 (− 6.747), and TO1 (− 7.195). The current measure for the TO5 is the usage of a dust mask suitable for the job. However, some additional comments are required: portable dust suction system should be made suitable for dust-making machines working in this area. Regarding corrective measures of TO3, sprinkler, and alarm system should be installed inside the room against possible fire risk. On the other side, a door should be made to allow room to open to the outside for the TO6.

Table 5 Distance from FFPIS and FFNIS and final revised closeness values of each hazard in the “Casting section”

Following the same procedure as summarized above in assessing the hazards and associated risks in the casting section of the observed aluminum plate-manufacturing plant, all hazards in the plant’s remaining sections are assessed. Figures 4 and 5 show the final FF-TOPSIS revised closeness coefficient values of each hazard and ranking of them, respectively.

Fig. 4
figure 4

Final FF-TOPSIS revised closeness coefficients of hazards in each section of the plant

Fig. 5
figure 5

Ranking of hazards in each section of the plant

After carrying out the risk assessment, some preventive measures are suggested for the most serious three hazards and their associated risks as determined by the proposed approach. They are provided as in the following:

Control measures for the “Casting line” hazards (DH3, DH6, DH5): Current measure for the DH3 is the usage of personal protective equipment (PPE) in accordance with the intervention of the employees. However, an additional measure is mandatory as follows: systems that prevent liquid aluminum from spilling can be developed. On the other side, a ventilation system suitable for the working environment should be established for the DH6. For “DH5”, which is the third most critical hazard, the followings are suggested: (1) mechanical systems should be used to extract slag from furnaces. (2) The suction system of the slag chamber should be strengthened.

Control measures for the “Carpentry workshop” hazards (M6, M8, M5): current safety measure for M6 is that nailers have floor detecting safety gear. Protective shoes and gloves should be worn as additional precautions. The current safety measure for M8 is an extra insulation in the area where the machines are plugged in. In addition, the leakage current relay should be added to the installation. To reduce the effects of M5, personal protective glasses are used during the operation. In addition, cutting saw should be used to reduce the burr that will occur in cutting machines.

Control measures for the “Finished goods stock section” hazard (MSH2, MSH3, MSH1): forklift routes have been determined, and warning signs have been placed. This is the existed measure for MSH2. In addition to these notices, personnel going to this area should be warned. Stacking rules handbook has been created to prevent MSH3. Stacks should be checked more frequently, and boundary lines indicating the stack upper limit should be drawn. No smoking signs were placed in the area to prevent MSH1. As an additional measure for this hazard, sanctions can be applied to smokers.

Control measures for the “Production section” hazard (PU4, PU7, PU6): the protective equipment of the guillotine shears should be checked at regular intervals to minimize the PU4. Scissors protective equipment is used for PU7. In addition, measure, a warning system can set up to notify whether the protective equipment is permanently attached or not. For PU6, a protective cover can be made on the roller straightener’s material entrance area against the risk of hand-arm grabbing.

Control measures for the “Packing section” hazard (P8, P6, P2): to prevent P8, personnel are regularly informed about the dangers of their work. Moreover, by marking the crane’s working area, it can be ensured that the personnel are not present in this area. For P6, the staff has been given carrying instruction. In addition, a carrying handbook can be created by considering ergonomic environments. For P2, the cabinets’ ventilation was opened, and gas detectors were installed in the system. A new system can be developed to monitor harmful gases in the system continuously.

Control measures for the “Slicing section” hazard (D4, D1, D2): employees wear earplugs suitable for the job to decrease the effects of D4. Earphones with higher insulation can be used as an additional measure. An emergency stop button has been added to the system for D1. To improve this measure, an emergency stop device integrated into the pressure sensors can be arranged. For D2, it has put a protective obstacle to prevent manual contact with the cutter blade. On the other side, protective plates can be added to the system to reduce the hazard.

Control measures for the “Sizing section” hazard (BK3, BK4, BK2): for BK3, the company currently uses emergency stop buttons. Besides this precaution, the operators should be prevented from approaching the rotating parts. For this purpose, fields that cannot be entered can be marked. Earplugs are used for BK4. As an additional comment, the cutting section of thick plates in the workplace can be isolated. Corsets were provided to the employees to prevent back and spine discomfort for the BK2. In addition, automatic cranes can be used to transport the plates.

Control measures for the “Washing and stretching section” hazard (YG4, YG5, YG6): in line with the measures taken for YG4, cleaning is performed only when the roller speeds are at minimum and under the control of responsible personnel. This hazard can be minimized if an automatic cleaning device is installed in this section. Emergency Stop Buttons have been added to the system for YG5. As well as this measure, emergency stop wires surrounding the line can be applied. For LA6, personnel use of earplugs is encouraged. Furthermore, protective equipment with high sound insulation can be used.

Control measures for the “Cold rolling section” hazard (SH1, SH5, SH10): for SH1, the enterprise has created “Safety Data Sheets” for the rolling oil and additives used. In addition, employees working in the Operations area can use masks suitable for work. This section should also be continuously ventilated to ensure that toxic gases are removed from the system. Periodic maintenance of the fire test system is made for SH5. In addition, regular fire drills can be made for this area, and personnel training can be provided. Bobbin trolley operating instructions have been created for SH10. In addition to this measure, coil car maneuver lines can be drawn.

Control measures for the “Technical maintenance section” hazard (TB6, TB12, TB11): for TB6, it is aimed to prevent the formation of the slippery ground using oil absorbers in the work area. In addition, oil collecting chambers in appropriate sizes can be made under the roller chocks. For TB12, protective glasses suitable for the current preventive measure are used. A fixed protective transparent plate should be mounted on the cutting tool as a creative precaution for this hazard. For TB11, necessary warnings are made for the operators, and the bearings are checked. It should also be ensured that the clearance between the cutting edges of the bearings is 3 mm.

Control measures for the “Factory site” hazard (GFS6, GFS7, GFS5): For GFS6, the control of the coupling guards'’fitting is carried out by the responsible personnel. Moreover, this control process should be standardized and its sustainability should be ensured. A detection report has been created for GFS7 and reported to hazard managers. Furthermore, by evaluating the detection reports, warning signs can be set for the most stylish situations. For the GFS5, after the operator has located the tubes, they are fixed to prevent movement. Motion sensors can also be placed in these tubes to report this situation to managers when necessary.

Comparative analysis of the results

To illustrate the advantages of our FF-TOPSIS approach, this study compared the crisp TOPSIS, grey TOPSIS, and general fuzzy TOPSIS techniques. The ranking results of the 85 potential hazards of the four TOPSIS techniques, as shown in Figs. 6 and 7. The crisp TOPSIS does not consider data/information uncertainty, converting experts’ judgments into a crisp value. The grey TOPSIS and general fuzzy TOPSIS reflect the uncertainty of experts’ assessment environment but do not measure the degree of membership and non-membership of the evaluated events simultaneously. The relative closeness index of each hazard obtained by these four techniques are different, and the priorities of 85 potential hazards are inconsistent.

Fig. 6
figure 6

Ranking results of the 85 potential hazards of the four TOPSIS techniques

Fig. 7
figure 7

Ranking results of the 85 potential hazards of the four TOPSIS techniques (continued)

The analysis results presented in Figs. 6 and 7 show the differences between the four TOPSIS techniques. In the Casting and Sizing sections, the orderings are determined precisely the same. Spearman’s Rho coefficients are calculated and presented in Table 6 to check whether the rankings for other sections were statistically significant. It was concluded that there is a significant relationship between the TOPSIS methods.

Table 6 Spearman’s Rho coefficients of TOPSIS methods

In addition, we have compiled a comparison table to summarize the differences of various TOPSIS techniques, as shown in Table 7. According to Table 7, none of those TOPSIS extensions is sufficient for demonstrating the risk assessment decision-making problems with Fermatean fuzzy data. The amount of uncertainty information covered by FF-TOPSIS is relatively higher than IF-TOPSIS and PF-TOPSIS. The Fermatean fuzzy linguistic scale, which we suggested in this study, reflects the expert’s subjective judgment in a broader perspective than other TOPSIS improvements. This is an important advantage of FF-TOPSIS.

Table 7 Description of the differences between the six TOPSIS techniques

Furthermore, the FF-TOPSIS was also compared with other popular MCDM methods, namely fuzzy SAW, fuzzy WASPAS, fuzzy MOORA, and fuzzy ARAS. As presented in Table 8, according to the correlation coefficient of overall ranking, the results of FF-TOPSIS and the other four MCDM methods are not completely consistent. As mentioned in the introduction section, TOPSIS is based on calculating the distance between each evaluated item and the PIS and NIS. Undoubtedly, FF-TOPSIS considers more reference parameters than other methods, so the ranking results are relatively reliable.

Table 8 The correlation coefficient of the overall ranking of five methods

Conclusion

Activities in the process industry contain several hazards, from harmful chemicals to mechanical risks. These hazards are addressed as originating from the product, process, human and working environment, and the risks associated with them are evaluated and prioritized. In this context, comprehensive methods developed beyond traditional risk assessment methods and transform traditional approaches’ disadvantageous features into advantages are being developed. Previous studies revealed that traditional methods require a time-consuming and burdensome data collection process and do not reflect experts’ subjective evaluations well enough. Concerning this situation, it has become important to suggest risk assessment methods based on fuzzy decision-making methods and to ensure their applicability.

Therefore, the current study suggests a soft computing approach that can address these concerns. This approach is provided by the integration of FFSs and TOPSIS method. The proposed model provides a framework for prioritizing risks in the aluminum plate production process based on numerous expert judgments. To show the applicability of the model, the risks arising in 12 different sections in the observed plant were prioritized by the proposed framework. Numerical results of the study demonstrate that the most important hazards and associated risks are stemmed from TO5, DH3, M6, MSH2, PU4, P8, D4, BK3, SH1, TB6, YG4. Reducing these risk factors will significantly reduce the risks of production. It has been concluded that the most critical risks are human-induced, and the use of appropriate protective equipment is necessary to minimize the risks.

In summary, the main contributions of the proposed approach are as follows.

  1. (i)

    TOPSIS method with FFSs has been implemented in a real-life manufacturing risk assessment problem for the first time in the literature.

  2. (ii)

    In the procedural steps of FF-TOPSIS, a new fuzzy Fermatean linguistic scale is developed, enabling experts easily disclose their opinions.

  3. (iii)

    The demonstrated case study is adaptable by any practitioners and researchers in the industry for their risk assessment problems.

  4. (iv)

    A benchmarking study with three different TOPSIS versions is provided to observe variations in risk ranking. For this aim, crisp TOPSIS, fuzzy TOPSIS, and grey TOPSIS are applied to the problem.

Besides these contributions to the literature, the current study still has some limitations that need to be addressed. Although this may be determined in this way in the context of the needs of the sector being worked on, when a new sector/process is adapted, additional risk parameters such as detectability, cost, prevention, effectiveness, sensitivity to non-usage of PPE, and sensitivity to no-application of maintenance may need to be taken into account. In this case, the weight assignment should be made by handling these new parameters by some comprehensive pairwise comparison-based methods. In this case, the BWM can be considered in future studies to calculate risk parameter weights using fewer pairwise comparisons and providing more consistent expert assessments.