Skip to main content

Advertisement

Log in

Energy Recovery in Pressurized Hydraulic Networks

  • Published:
Water Resources Management Aims and scope Submit manuscript

Abstract

This paper aims to evaluate the possibility of using non-utilized hydraulic energy in urban water distribution systems. For this purpose, the viability and possible alternatives of installing conventional turbines or pumps working as turbines (PATs = Pumps as Turbines) at the head of pressure hydraulic networks in two towns in the province of Huelva have been studied: Cañaveral de León and Aracena (Andalucía, southwest Spain). Sensitivity analyses are carried out for: (a) To study the feasibility and efficiency of installing turbines or PATs in the hydraulic networks; (b) To determine the required hydraulic capacity of the turbines or PATs; (c) To analyse the installation points in the pipeline network; and (d) To evaluate the possible generation of electrical energy. The evaluation of the recoverable amount of hydraulic energy in both water distribution systems requires the application of the energy conservation equation, taking into account the calculation of load losses, the Darcy-Weisbach equation. A diagram energy height-flow rate with different working ranges of commercial turbines/PATs was used for the selection of the appropriate hydraulic machine. The results obtained of the Aracena hydraulic network show that the best solution would be the installation of a 2 kW BANKI that could generate an approximate annual energy of 17,52 MWh/year. In the Cañaveral de León water supply system a 0,75 kW BANKI turbine with an approximate annual energy generation of 6,57 MWh/year is proposed as the best solution.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Institutional subscriptions

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5

Similar content being viewed by others

Data Availability

The necessary data has been provided by the public company ‘Gestión Integral del Agua Costa de Huelva S.A (Giahsa)’.

References

  • Carravetta A, Fecarotta O, Del Giudice G, Ramos HM (2014) Energy recovery in water systems by PATs: A comparisons among the different installation schemes. Procedia Engineering 70:275–284

    Article  Google Scholar 

  • Crespo-Chacón M, Rodríguez-Díaz JA, García-Morillo J, McNabola A (2019) Pump-as-Turbine selection methodology for energy recovery in irrigation networks: Minimising the payback period. Water 11:149

    Article  Google Scholar 

  • Dini M, Asadi A (2020) Optimal operational scheduling of available partially closed valves for pressure management in water distribution networks. Water Resour Manage 34:2571–2583

    Article  Google Scholar 

  • European Commission (2017) Report from the Commission to the European Parliament, the Council, the European Economic and Social Committee and the Committee of the Regions Accompanying the Mid-term Evaluation of the LIFE Programme; European Commission: Brussels. Belgium

  • Fecarotta O, Aricó C, Carravetta A, Martino R, Ramis HM (2015) Hydropower potential in water distribution networks: Pressure control by PATs. Water Resour Manage 29:699–714

    Article  Google Scholar 

  • Fernández-García I, McNabola A (2020) Maximizing hydropower generation in gravity water distribution networks: Determining the optimal location and number of pumps as turbines. J Water Resour Plan Manag 146(1):04019066

    Article  Google Scholar 

  • Fontana N, Giugni M, Glielmo L, Marini G, Zollo R (2019) Operation of a prototype for real time control of pressure and hydropower generation in water distribution networks. Water Resour Manage 33(2):697–712

    Article  Google Scholar 

  • García-Morillo J, McNabola A, Camacho E, Montesinos P, Rodríguez-Díaz JA (2018) Hydropower energy recovery in pressurized irrigation networks: A case of study of an irrigation district in the South of Spain. Agric Water Manag 204:17–27

    Article  Google Scholar 

  • Giles RV (1962) Theory and problems of Fluid Mechanics and Hydraulics. Schaum Publishing Co., New York, USA

    Google Scholar 

  • Keeling M, Sullivan M (2012). Fixing the future. Why we need smarter water management for the world’s most essential resource. IBM Global Services, Executive Report, New York, USA.

  • Kim I, James JA, Crittenden J (2015) The energy-efficient, economical, and environmental impacts of microturbines on residential customers. 2015 Seventh Anual IEEE Green Technologies Conference, New Orleans, LA, USA

  • Kyle P, Hejazi M, Kim S, Patel P, Graham N, Liu YL (2021) Assessing the future of global energy-for-water. Environ Res Lett 16:024031

    Article  Google Scholar 

  • Lima FA, Córcoles JI, Tarjuelo JM, Martínez-Romero A (2019) Collective irrigation network analysis considering plots irrigation scheduling. Ingeniería del Agua 23(2):77–87

    Article  Google Scholar 

  • McNabola A, Coughlan P, Corcoran L, Power C, Williams AP, Harris I, Gallagher J, Styles D (2014) Energy recovery in the water industry using microhydropower: an opportunity to improve sustainability. Water Policy 16:168–183

    Article  Google Scholar 

  • Pérez-Sánchez M, Sánchez-Romero FJ, Ramos HM, López-Jiménez PA (2017) Optimization strategy for improving the energy efficiency of irrigation systems by micro hydropower: Practical application. Water 9:799

    Article  Google Scholar 

  • Pérez-Sánchez M, Sánchez-Romero FJ, Ramos HM, López-Jiménez PA (2020) Improved planning of energy recovery in water systems using a new analytic approach to PAT performance curves. Water 12(2):468

    Article  Google Scholar 

  • Power C, Mc NA, Coughlan P (2016) Micro-hydropower energy recovery at waste-water treatment plants: Turbine selection and optimization. J Energy Eng 143(1):04016036

    Article  Google Scholar 

  • Ramos HM, McNabola A, López-Jiménez PA, Pérez-Sánchez M (2020) Smart water management towards future water sustainable networks. Water 12:58

    Article  Google Scholar 

  • Rodríguez-Pérez AM, Pérez-Calañas C, Pulido-Calvo I (2019) Selección de la localización y el tipo de microturbinas en redes hidráulicas a presión. VI Jornadas de Ingeniería del Agua, Universidad de Castilla-La Mancha, Toledo, pp 553–556

  • Rodríguez-Pérez AM, Pulido-Calvo I (2019) Analysis and viability of microturbines in hydraulic networks: a case study. Journal of Water Supply: Research and TechnologyAQUA 68(6), 474–482.

  • Rodríguez-Pérez AM, Pulido-Calvo I, Cáceres-Ramos P (2021) A computer program to support the selection of turbines to recover unused energy at hydraulic networks. Water 13:467

    Article  Google Scholar 

  • Rodríguez-Pérez AM, Pulido-Calvo I, Pereira-Villaseñor M, Domínguez-Castro L (2017) Evaluación de la instalación de microturbinas en redes hidráulicas a presión. V Jornadas de Ingeniería del Agua, Universidade da Coruña, A Coruña, Spain

  • Romero-Marrero L, Pérez-Sánchez M, López-Jiménez PA (2018) Estimation of the characteristic curves of pumped systems working as turbines through their curves operating as pump. Ingeniería del Agua 22(1):15–26

    Article  Google Scholar 

  • Samora I, Manso P, Franca MJ, Schleiss AJ, Ramos HM (2016a) Opportunity and economic feasibility of inline microhydropower units in water supply networks. J Water Resour Plan Manag 142(11):04016052

    Article  Google Scholar 

  • Samora I, Franca MJ, Schleiss AJ, Ramos HM (2016b) Simulated annealing in optimization of energy production in a water supply network. Water Resour Manage 30:1533–1547

    Article  Google Scholar 

  • Váquiro J (2020) Periodo de recuperación de la inversión-PRI. Revista Pymes futuro 1(01):45–92

    Google Scholar 

Download references

Acknowledgments

The authors are grateful to the public company ‘Gestión Integral del Agua Costa de Huelva S.A (Giahsa)’ for providing all the necessary data from its facilities. The authors would also like to thank Deryck Barker Fraser for the translation of the manuscript

Author information

Authors and Affiliations

Authors

Contributions

Conceptualization and methodology: A.M.R.-P., C.P.-C. and I.P.-C.; validation, formal analysis, and investigation: A.M.R.-P., C.P.-C. and I.P.-C.; writing—original draft: A.M.R.-P. and C.P.-C.; writing—review and supervision: I.P.-C. All authors have read and agreed to the published version of the manuscript.

Corresponding author

Correspondence to Ángel Mariano Rodríguez-Pérez.

Ethics declarations

Conflicts of Interest

The authors have no conflicts of interest to declare that are relevant to the content of this article.

Additional information

Publisher's Note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Rodríguez-Pérez, Á.M., Pérez-Calañas, C. & Pulido-Calvo, I. Energy Recovery in Pressurized Hydraulic Networks. Water Resour Manage 35, 1977–1990 (2021). https://doi.org/10.1007/s11269-021-02824-4

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s11269-021-02824-4

Keywords

Navigation