A note on the single machine CON and CONW problems with lot scheduling

  • Published:
Journal of Combinatorial Optimization Aims and scope Submit manuscript

Abstract

We study extensions of the classical single machine common due-date (CON) and common due-window (CONW) assignment problems to the setting of lot scheduling. In the CON problem, all the jobs share a common due-date, and jobs completed prior to or after the due-date are penalized according to their earliness/tardiness. In CONW, there exists a time interval, such that jobs completed within this interval are not penalized. In both cases the due-date/due-window are decision variables. In lot scheduling, a number of customer orders of different sizes may be processed in the same lot. We allow order splitting between consecutive lots. The objective is to find the order allocation to lots, such that the total cost of earliness, tardiness and due-date/due-window is minimized. Given \(n\) orders, and under the very realistic assumption that the lot capacity is of the order of \(n\), we introduce polynomial time dynamic programming algorithms for both extensions. Our numerical tests indicate that both algorithms can easily solve medium-size problems.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Institutional subscriptions

Similar content being viewed by others

References

  • Bulbul K, Kedad Sidhoum S, Sen H (2019) Single machine common due date total earliness/tardiness scheduling with machine availability. J Sched 22:543–565

    Article  MathSciNet  Google Scholar 

  • Gordon V, Proth J-P, Chu C (2002) A survey of the state-of-the-art of common due date assignment and scheduling research. Eur J Oper Res 139:1–25

    Article  MathSciNet  Google Scholar 

  • Hou Y-T, Yang D-L, Kuo W-H (2014) Lot scheduling on a single machine. Inf Process Lett 114:718–722

    Article  MathSciNet  Google Scholar 

  • Janiak A, Janiak WA, Krysiak T, Kwiatkowski T (2015) A survey on scheduling problems with due windows. Eur J Oper Res 242:347–357

    Article  MathSciNet  Google Scholar 

  • Koulamas C (2017) Common due date assignment with generalized earliness/tardiness penalties. Comput Ind Eng 109:79–83

    Article  Google Scholar 

  • Liman SD, Panwalkar SS, Thongmee S (1996) Determination of common due window location in a single machine scheduling problem. Eur J Oper Res 93:68–74

    Article  Google Scholar 

  • Liman SD, Panwalkar SS, Thongmee S (1998) Common due window size and location determination in a single machine scheduling problem. J Oper Res Soc 49:1007–1010

    Article  Google Scholar 

  • Mor B (2017) Minmax common due-window assignment and scheduling on a single machine with two competing agents. J Oper Res Soc 69:589–602

    Article  Google Scholar 

  • Mor B (2019) Minmax scheduling problems with common due-date and completion time penalty. J Comb Optim 38:50–71

    Article  MathSciNet  Google Scholar 

  • Mor B, Mosheiov G (2017) A two-agent single machine scheduling problem with due-window assignment and a common flow-allowance. J Comb Optim 33:1454–1468

    Article  MathSciNet  Google Scholar 

  • Mor B (2021) Single-machine lot scheduling with variable lot processing times. Eng Optim 53(2):321–334

    Article  MathSciNet  Google Scholar 

  • Mor B, Mosheiov G, Shapira D (2020) Lot scheduling on a single machine to minimize the (weighted) number of tardy orders. Inf Process Lett 164:106009

    Article  MathSciNet  Google Scholar 

  • Mor B, Mosheiov G, Shapira D (2021) Single machine lot scheduling with optional job-rejection. J Comb Optim 41(1):1–11

    Article  MathSciNet  Google Scholar 

  • Panwalkar SS, Smith ML, Seidmann A (1982) Common due date assignment to minimize total penalty for the one machine scheduling problem. Oper Res 30:391–399

    Article  Google Scholar 

  • Shi H-B, Wang J-B (2019) Research on common due window assignment flowshop scheduling with learning effect and resource allocation. Eng Optim. https://doi.org/10.1080/0305215X.2019.1604698

    Article  Google Scholar 

  • Xiong X, Wang D, Cheng TCE, Wu C-C, Yin Y (2018) Single-machine scheduling and common due date assignment with potential machine disruption. Int J Prod Res 56:1345–1360

    Article  Google Scholar 

  • Zhang E, Liu M, Zheng F, Xu Y (2019a) Single machine lot scheduling to minimize the total weighted (discounted) completion time. Inf Process Lett 142:46–51

    Article  MathSciNet  Google Scholar 

  • Zhang L, Zhang Y, Bai Q (2019b) Two-stage medical supply chain scheduling with an assignable common due-window and shelf life. J Comb Optim 37:319–329

    Article  MathSciNet  Google Scholar 

Download references

Acknowledgements

The second author was supported by the Israel Science Foundation (grant No.2505/19), by the Recanati Fund of The School of Business Administration, and by Charles I. Rosen Chair of Management, The Hebrew University of Jerusalem, Israel.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Gur Mosheiov.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Mor, B., Mosheiov, G. A note on the single machine CON and CONW problems with lot scheduling. J Comb Optim 42, 327–338 (2021). https://doi.org/10.1007/s10878-021-00709-1

Download citation

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10878-021-00709-1

Keywords

Navigation