RAM analysis and availability optimization of thermal power plant water circulation system using PSO

https://doi.org/10.1016/j.egyr.2020.12.025Get rights and content
Under a Creative Commons license
open access

Highlights

  • RAM analysis framework for performance evaluation of a water circulation system is used in a coal-fired power plant.

  • Reliability block diagram (RBD), fault tree analysis (FTA) and Markov birth–death probabilistic approach has been used.

  • The maintenance priority of the system is decided on the basis of criticality level.

  • Particle swarm optimization technique is used for availability optimization of water circulation system in coal based power plant.

Abstract

This paper presents reliability, availability, and maintainability (RAM) analysis framework for evaluating the performance of a circulation system of water (WCS) used in a coal-fired power plant (CFPP). The performance of WCS is evaluated using a reliability block diagram (RBD), fault tree analysis (FTA), and Markov birth–death probabilistic approach. In this work, the system under study consists of five subsystems connected in series and parallel configuration namely condensate extraction pump (CEP), low-pressure feed water heater (LPH), deaerator (DR), boiler feed pump (BFP), high-pressure feed water heater (HPH). The reliability block diagram (RBD) and fault tree approach (FTA) have been employed for the performance evaluation of WCS. The Markov probabilistic approach based simulation model is developed. The transition diagram of the proposed model represented several states with full working capacity, reduced capacity, and failed state. The ranking of critical equipment is decided on the basis of criticality level of equipment. The study results revealed that the boiler feed pump affects the system availability at most, while the failure of deaerator affects it least. The availability of the system is optimized using the particle swarm optimization method. The optimized availability parameter (TBF, TTR) based modified maintenance strategy is recommended to enhance the availability of the plant system. The optimized failure rate and repair rate parameters of the subsystem are used to suggest a suitable maintenance strategy for the water circulation system of the thermal power plant. The proposed RAM framework helps the decision-makers to plan the maintenance activity as per the criticality level of subsystems and allocate the resources accordingly.

Keywords

Availability analysis
Reliability block diagram
Fault tree analysis
Markov approach
Particle swarm optimization