Abstract
The Routing Open Shop Problem deals with \(n \) jobs located in the nodes of an edge-weighted graph \(G=(V,E) \) and \(m \) machines that are initially in a special node calleddepot. The machines must process all jobs in arbitrary order so that each machine processes at most one job at any one time and each job is processed by at most one machine at any one time. The goal is to minimize the makespan; i.e., the time when the last machine returns to the depot. This problem is known to be NP-hard even for the two machines and the graph containing only two nodes. In this article we consider the particular case of the problem with a \(2\)-node graph, unit processing time of each job, and unit travel time between every two nodes. The conjecture is made that the problem is polynomially solvable in this case; i.e., the makespan depends only on the number of machines and the loads of the nodes and can be calculated in time \(O(\log mn) \). We provide some new bounds on the makespan in the case of \(m = n \) depending on the loads distribution.
Similar content being viewed by others
REFERENCES
T. Gonzalez and S. Sahni, “Open Shop Scheduling to Minimize Finish Time,” J. ACM. 23 (4), 665–679 (1976).
D. P. Williamson, L. A. Hall, J. A. Hoogeveen, C. A. J. Hurkens, J. K. Lenstra, S. V. Sevast’janov, and D. B. Shmoys, “Short Shop Schedules,” Oper. Res.45, 288–294 (1997).
R. Cole, K. Ost, and S. Schirra, “Edge-Coloring Bipartite Multigraphs in \(O(E\times \log {D})\) Time,” Combinatorica 21 (1), 5–12 (2001).
I. Averbakh, O. Berman, and I. Chernykh, “A \(6/5 \)-Approximation Algorithm for the Two-Machine Routing Open Shop Problem on a \(2\)-Node Network,” European J. Oper. Res. 166 (1), 3–24 (2005).
I. Averbakh, O. Berman, and I. Chernykh, “The Routing Open-Shop Problem on a Network: Complexity and Approximation,” European J. Oper. Res. 173 (2), 521–539 (2006).
A. V. Kononov, “On the Routing Open Shop Problem with Two Machines on a Two-Vertex Network,” Diskret. Anal. Issled. Oper. 19 (2), 54–74 (2012) [J. Appl. Ind. Math. 6, 318–331 (2012)].
A. V. Pyatkin and I. D. Chernykh, “The Open Shop Problem with Routing at a Two-Node Network and Allowed Preemption,” Diskret. Anal. Issled. Oper. 19 (3), 65–78 (2012) [J. Appl. Ind. Math. 6 (3), 346–354 (2012)].
R. Van Bevern and A. V. Pyatkin, “Completing Partial Schedules for Open Shop with Unit Processing Times and Routing,” in Computer Science—Theory and Applications: Proceedings of 11th International Computer Science Symposium in Russia (St. Petersburg, Russia, June 9–13, 2016) (Springer, Cham, 2016), pp. 73–87.
R. Van Bevern, A. V. Pyatkin, and S. V. Sevastyanov, “An Algorithm with Parameterized Complexity of Constructing the Optimal Schedule for the Routing Open Shop Problem with Unit Execution Times,” Sibirean Electron. Math. Rep. 16, 42–84 (2019).
P. Brucker, S. Knust, T. C. E. Cheng, and N. V. Shakhlevich, “Complexity Results for Flow-Shop and Open-Shop Scheduling Problems with Transportation Delays,” Ann. Oper. Res. 129, 81–106 (2004).
I. Lushchakova, A. Soper, and V. Strusevich, “Transporting Jobs through a Two-Machine Open Shop,” Naval Res. Logistics 56, 1–18 (2009).
V. Strusevich, “A Heuristic for the Two-Machine Open-Shop Scheduling Problem with Transportation Times,” Discrete Appl. Math. 93 (2), 287–304 (1999).
M. O. Golovachev and A. V. Pyatkin, “Routing Open Shop with Two Nodes, Unit Processing Times, and Equal Number of Jobs and Machines,” in Mathematical Optimization Theory and Operations Research:Proceedings of 18th International Conference (Ekaterinburg, Russia, July 8–12, 2019) (Springer, Cham, 2019), pp. 264–276.
H. Bräsel, D. Kluge, and F. Werner, “A Polynomial Algorithm for the \([n/m/0 \), \(t_{ij}=1, \text {Tree/C}_{\max }]\) Open Shop Problem,” European J. Oper. Res.72 (1), 125–134 (1994).
R. Diestel, Graph Theory (Springer, Heidelberg, 2016).
Funding
The authors were supported by the Program of Basic Research of the Siberian Branch of the Russian Academy of Sciences (project no. 0314–2019–0014) and the Russian Foundation for Basic Research (project no. 20–01–00045).
Author information
Authors and Affiliations
Corresponding authors
Additional information
Translated by G.A. Chumakov
Rights and permissions
About this article
Cite this article
Golovachev, M.O., Pyatkin, A.V. On a Routing Open Shop Problem on Two Nodes with Unit Processing Times. J. Appl. Ind. Math. 14, 470–479 (2020). https://doi.org/10.1134/S1990478920030060
Received:
Revised:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1134/S1990478920030060