Abstract
The finite element method was used in this study to investigate cutoff walls and downstream filters to control seepage, the exit hydraulic gradient, and uplift forces for dams. Experimental data was used for validating the numerical modelling. The effective parameters are the length of filter and its distance downstream from the dam, the depth of the cutoff walls, the upstream dam head, and the thickness of alluvial foundation. The results show that by increasing filter length, the exit hydraulic gradient, uplift force, and seepage are reduced. The optimum relative length of the filter is L/H = 0.028 which results in a decrease of about 65% in the exit hydraulic gradient, a 35% decrease in seepage and 10% reduction in the uplift force at the upstream foundation and a 60% decrease in the uplift force at the downstream foundation. Increase of cutoff wall depth reduces the exit hydraulic gradient, uplift force, and seepage. Using two cutoff walls both upstream and downstream of the dam decreases seepage, hydraulic gradient, and uplift force 132%, 450% and 11% respectively. However, using an upstream cutoff and downstream filter decreases seepage, hydraulic gradient, and uplift force by 180%, 490%, and 119% respectively. Thus, based on this study, recommendations for suitable combinations of upstream cutoff and downstream filter are provided.
Similar content being viewed by others
References
Al-Delewy AA, Shukur AHK, Al-Musawi WH (2006) Optimum design of control devices for safe seepage under hydraulic structures. J Eng Sustain Dev 10(1):66–87 ISSN 1813-7822
Amiri Tokaldany E, Khalili Shayan H (2012) Uplift force, seepage, and exit gradient under diversion dams. Proceedings of the institution of civil engineers. Water Manag 166(WM8):452–462. https://doi.org/10.1680/wama.11.00084
Elganainy MA (1986) Flow underneath a pair of structures with intermediate filters on a drained stratum. Appl. Math Modelling 10:394–400. https://doi.org/10.1016/0307-904X(86)90017-X
Hathoot H (1985) Seepage beneath a concrete dam with a downstream filter. Appl Math Model 10(2):129–132. https://doi.org/10.1016/0307-904X(86)90084-3
Jain A, Reddi M (2011) Finite-depth seepage below flat apron with equal end cutoffs. J Hydraulic Eng 137(12):1659–1667. https://doi.org/10.1061/(ASCE)HY.1943-7900.0000459
Khalili Shayan H, Amiri Tokaldany E (2015) Effects of blanket, drains, and cutoff wall on reducing uplift pressure, seepage, and exit gradient under hydraulic structures. Int J Civil Eng Trans A: Civil Eng 13(4A):486–500. https://doi.org/10.22068/IJCE.13.4.486
Khatavkar P, Mays LW (2017) Optimization models for the design of vegetative filter strips for stormwater runoff and sediment control. Water Resour Manag 31:2545–2560. https://doi.org/10.1007/s11269-016-1552-y
Khoramshokooh N, Veiskarami M, Nikoo MR, Pourvahedi Roshandeh S (2018) Multi-objective hydraulic optimization of diversion dam’s cut-off. Water Resour Manag 32:3723–3736. https://doi.org/10.1007/s11269-018-2015-4
Kumar A, Singh B, Chawla AS (1986) Design of structures with intermediate filters. J Hydraul Eng 112(3):206–219. https://doi.org/10.1061/(ASCE)0733-9429(1986)112:3(206)
Mcloughlin SH, Ahmed A (2012) Seepage under hydraulic structures provided with an intermediate filter. ICSE6, Paris, pp 27–31
Nourani B, Salmasi F, Abbaspour A, Oghati B (2017) Numerical investigation of the optimum location for vertical drains in gravity dams. Geotech Geol Eng 35(2):799–808. https://doi.org/10.1007/s10706-016-0144-1
Salmasi F, Khatibi R, Nourani B (2017) Investigating reduction of uplift forces by longitudinal drains with underlined canals. ISH J Hydraul Eng 24(1):81–91. https://doi.org/10.1080/09715010.2017.1350605
Salmasi F, Nourani B, Abraham J (2020) Investigation of the effect of the different configurations of double-cutoff walls beneath hydraulic structures on uplift forces and exit hydraulic gradients. J Hydrol 586:124858. https://doi.org/10.1016/j.jhydrol.2020.124858
SEEP/W (2012) Seepage modeling with SEEP/W. Geo-Slope International Ltd, Calgary
Singh RM (2011) Design of Barrages with genetic algorithm based embedded simulation optimization approach. Water Resour Manag 25:409–429. https://doi.org/10.1007/s11269-010-9706-9
USBR (2014) Embankment dams. Chapter 8, seepage, phase 4. U.S. department of interior bureau of reclamation
Author information
Authors and Affiliations
Corresponding author
Ethics declarations
Conflict of Interest
None.
Additional information
Publisher’s Note
Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.
Rights and permissions
About this article
Cite this article
Salmasi, F., Nouri, M. & Abraham, J. Upstream Cutoff and Downstream Filters to Control of Seepage in Dams. Water Resour Manage 34, 4271–4288 (2020). https://doi.org/10.1007/s11269-020-02674-6
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s11269-020-02674-6