Abstract
The 55-km-long Hong Kong–Zhuhai–Macao Bridge (HZMB) is the world’s longest sea-crossing bridge, connecting Hong Kong with Zhuhai and Macao at the mouth of the Pearl River Estuary in China, comprising 22.9-km-long steel bridges. HZMB is the leading steel bridge in China, with top-level manufacturing and installation technology. This paper outlines the steel bridge construction experiences of HZMB to provide comparisons for the construction of other long sea-crossing steel bridges at home or abroad. The main considerations of construction constraints, scheme selection, structural and aesthetic design of HZMB are presented, and the following points related to new strategies in the steel bridge construction of HZMB are elaborated: (1) construction quality assurance, (2) automatic manufacturing technology, (3) large segment offshore installation, (4) eco-friendly paint (content limitation of volatile organic compounds) and new multifunctional inspection gantry, and (5) Guss Mastic Asphalt steel deck pavement system. The successful implementation of those strategies shows that the steel bridge construction of HZMB promotes improvement in the overall construction and management level of the Chinese bridge industry. The advanced experience of HZMB has opened up broad prospects for the design and construction of offshore bridge engineering in China.
Similar content being viewed by others
References
Almarnaess, A. (1985). Fatigue handbook: Offshore steel structures, United States.
Bocci, E., & Canestrari, F. (2012). Analysis of structural compatibility at interface between asphalt concrete pavements and orthotropic steel deck surfaces. Transportation Research Record, 2293, 1–7. https://doi.org/10.3141/2293-01.
Chan, A. P. C., Osei-Kyei, R., Hu, Y., & Yun, L. (2018). A fuzzy model for assessing the risk exposure of procuring infrastructure mega-projects through public-private partnership: The case of Hong Kong–Zhuhai–Macao Bridge. Frontiers of Engineering Management, 5(1), 64–77. https://doi.org/10.15302/J-Fem-2018067.
Cho, T. J., & Kim, T. S. (2008). Probabilistic risk assessment for the construction phases of a bridge construction based on finite element analysis. Finite Elements in Analysis and Design, 44(6–7), 383–400. https://doi.org/10.1016/j.finel.2007.12.004.
Dai, J., Xu, Z. D., Yin, X. J., Gai, P. P., & Luo, Y. (2019). Parameters design of TMD mitigating vortex-induced vibration of the Hong Kong–Zhuhai–Macao Bridge deep-water nonnavigable bridge. Journal of Bridge Engineering, 24, 8. https://doi.org/10.1061/(asce)be.1943-5592.0001450.
Greig, A., Rivas, S., Blackman, S., & Tizani, W. (2001). Welding automation in space-frame bridge construction. Computer-Aided Civil and Infrastructure Engineering, 16(3), 188–199. https://doi.org/10.1111/0885-9507.00225.
Gurney, T. (1992). Fatigue of steel bridge decks. No. 8, United Kingdom.
Han, J. H., Ahn, J. P., & Shin, M. C. (2003). Effect of interlayer thickness on shear deformation behavior of AA5083 aluminum alloy/SS41 steel plates manufactured by explosive welding. Journal of Materials Science, 38(1), 13–18. https://doi.org/10.1023/A:1021197328946.
Hobbacher, A. F., Hicks, S. J., Karpenko, M., Thole, F., & Uy, B. (2016). Transfer of Australasian bridge design to fatigue verification system of Eurocode 3. Journal of Constructional Steel Research, 122, 532–542. https://doi.org/10.1016/j.jcsr.2016.03.023.
Hu, Z. N., Xie, Y. L., & Wang, J. (2015). Challenges and strategies involved in designing and constructing a 6 km immersed tunnel: A case study of the Hong Kong–Zhuhai–Macao Bridge. Tunnelling and Underground Space Technology, 50, 171–177. https://doi.org/10.1016/j.tust.2015.07.011.
Liu, Y. M., Zhang, Q. H., Zhang, P., Cui, C., & Bu, Y. Z. (2016). Study on fatigue life of U-rib butt weld in orthotropic steel bridge deck of Hong Kong–Zhuhai–Macao Bridge. China Journal of Highway and Transport, 29(12), 25–33. (in Chinese).
Nussbaumer, A., Borges, L., & Davaine, L. (2018). Fatigue design of steel and composite structures: Eurocode 3: Design of steel structures Part 1-9-Fatigue/Eurocode 4: Design of composite steel and concrete structures.
Oh, C. K., Hong, K. J., Bae, D., Do, H., & Han, T. (2011). Analytical and experimental studies on optimal details of orthotropic steel decks for long span bridges. International Journal of Steel Structures, 11(2), 227–234. https://doi.org/10.1007/s13296-011-2010-6.
Pires, J. N., Loureiro, A., Godinho, T., Ferreira, P., Fernando, B., & Morgado, J. (2003). Welding robots. IEEE Robotics and Automation Magazine, 10(2), 45–55. https://doi.org/10.1109/MRA.2003.1213616.
Su, Q. K. (2005). An analysis of special techniques for sea-crossing bridge. Journal of Highway and Transportation Research and Development, 12, 101–104. (in Chinese).
Su, Q. K., & Zhang, J. W. (2008). Approach of management planning in constructing high-quality cross-sea bridge. In Proceedings of the tenth international symposium on structure engineering for young experts (pp. 1–10).
Tan, P., Huang, J. D., Chang, C. M., & Zhang, Y. (2017). Failure modes of a seismically isolated continuous girder bridge. Engineering Failure Analysis, 80, 57–78. https://doi.org/10.1016/j.engfailanal.2017.05.030.
Wang, T., Li, Y., Ning, J., & Li, Y. W. (2011a). Isolation effect analysis for Hong Kong-Zhuhai-Macau Bridge. Advances in Civil Engineering, Pts, 1–4(90–93), 946–950. https://doi.org/10.4028/www.scientific.net/AMM.90-93.946.
Wang, T., Ning, J., & Li, Y. (2011b). Seismic response analysis for Hong Kong-Zhuhai-Macau Bridge. Advanced Building Materials, 250–253(1–4), 1628–1632.
Zavadskas, E. K., Liias, R., & Turskis, Z. (2008). Multi-attribute decision-making methods for assessment of quality in bridges and road construction: State-of-the-art surveys. Baltic Journal of Road and Bridge Engineering, 3(3), 152–160. https://doi.org/10.3846/1822-427x.2008.3.152-160.
Zeng, W., Zhang, J. W., Wang, H. W., & Zhou, H. T. (2018). Supplier development and its incentives in infrastructure mega-projects: A case study on Hong Kong–Zhuhai–Macao Bridge project. Frontiers of Engineering Management, 5(1), 88–97. https://doi.org/10.15302/J-Fem-2018077.
Zhu, Y. L., Zhang, J. W., & Gao, X. L. (2018). Construction management and technical innovation of the main project of Hong Kong–Zhuhai–Macao Bridge. Frontiers of Engineering Management, 5(1), 128–132. https://doi.org/10.15302/J-Fem-2018201.
Author information
Authors and Affiliations
Contributions
All authors contributed to the study conception and design. Material preparation was performed by Hong-bing Xie, Feng Wen, Fang Li and Ji-zhu Liu. The first draft of the manuscript was written by Wen-bo Gao. Quan-ke Su and JIn-wen Zhang helped to revise the draft of the manuscript and all authors commented on previous versions of the manuscript. All authors read and approved the final manuscript.
Corresponding author
Ethics declarations
Conflict of interest
The authors declare that they have no conflict of interest.
Additional information
Publisher's Note
Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.
Rights and permissions
About this article
Cite this article
Gao, Wb., Su, Qk., Zhang, Jw. et al. Steel Bridge Construction of Hong Kong–Zhuhai–Macao Bridge. Int J Steel Struct 20, 1498–1508 (2020). https://doi.org/10.1007/s13296-020-00383-9
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s13296-020-00383-9