Abstract
The post-earthquake repair process of buildings is one of the key components of building seismic resilience. Understanding the details of the repair process in advance will benefit the evaluation and decision making for the seismic resilience of buildings. To this end, a five-dimensional (5D) simulation method on the post-earthquake repair process of buildings is proposed based on building information modeling (BIM), by which the repair activities can be presented in the way associated with a 3D model, time (denoted as the fourth dimension), and the related costs (denoted as the fifth dimension). First, a decision-making model of repair schemes based on the interval index of the possibility degree is created to determine the optimal post-earthquake repair schemes for a damaged building. Subsequently, an algorithm based on separate flow-repetitive process is designed to automatically make the repair schedule on a BIM platform according to the determined repair schemes. Finally, an algorithm of automatic mapping between the components in BIM and their repair schedules is developed, so that a 5D simulation of a post-earthquake repair process can be implemented. A six-story office building is selected as a case study, and the details of the post-earthquake repair process (e.g., the costs of labor, material and equipment over the repair time) are presented by the proposed 5D simulation method. The outcome of this study can be used to evaluate the seismic resilience of buildings and also to facilitate the decision making for seismically resilient buildings by providing the detailed guidance of the repair process.
Similar content being viewed by others
References
AbouRizk S (2010), “Role of Simulation in Construction Engineering and Management,” Journal of Construction Engineering and Management-Asce, 136(10): 1140–1153. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000220.
Aeido Group. About us. http://www.aeido.cn/ (Access on Oct 13, 2018).
Barazzetti L and Banfi F (2017), “Historic BIM for Mobile VR/AR Applications,” Mixed Reality and Gamification for Cultural Heritage, pp. 271–290. https://doi.org/10.1007/978-3-319-49607-8_10.
Beijing Municipal Commission of Housing and Urban-Rural Development (BCHUD) (2012), “Beijing Repair Code for Building Renovation Projects,” China Architecture Industry Press, Beijing, China. (ISBN: 1511223552) (in Chinese)
Bruneau M, Chang SE, Eguchi RT, Lee GC, O’Rourke TD, Reinhorn AM, Shinozuka M, Tierney K, Wallace WA and Winterfeldt Dv (2003), “A Framework to Quantitatively Assess and Enhance the Seismic Resilience of Communities,” Earthquake Spectra, 19(4): 733–752. https://doi.org/10.1193/1.1623497.
Charalambos G, Dimitrios V and Symeon C (2014), “Damage Assessment, Cost Estimating, and Scheduling for Post-Earthquake Building Rehabilitation Using BIM,” In Proceedings of the 31st International Conference of CIB W78, Orlando, Florida, USA, 23–25 June, pp. 398–405. https://doi.org/10.1061/9780784413616.050.
Christodoulou S, Vamvatsikos D and Georgiou C (2010), “A BIM-Based Framework for Forecasting and Visualizing Seismic Damage, Cost and Time to Repair,” in K. Menzel, R. Scherer, editors, Proceedings of the European Conference on Product and Process Modelling 2010, Cork, Ireland, September 14–16, 2010, pp. 33–38. http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.721.8440&rep=rep1&type=pdf.
Construction Specifications Institute (CSI) and Construction Specifications Canada (CSC) (2016), “MasterFormat-Master List of Numbers and Titles for the Construction Industry,” Builder’s Book, Los Angeles, CA, USA. (ISBN: 9780997462296)
Eid MS and El-Adaway IH (2017), “Sustainable Disaster Recovery Decision-Making Support Tool: Integrating Economic Vulnerability into the Objective Functions of the Associated Stakeholders,” Journal of Management in Engineering, 33(2): 04016041. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000487.
Elnashai AS, Gencturk B, Kwon OS, Al-Qadi IL, Hashash Y, Roesler JR, Kim SJ, Jeong SH, Dukes J and Valdivia A (2010), “The Maule (Chile) Earthquake of February 27, 2010: Consequence Assessment and Case Studies,” MAE Center Report, No. 10–04. http://hdl.handle.net/2142/18212.
Ge LJ, Wang SX and Jiang XY (2016), “A Combined Interval AHP-Entropy Method for Power User Evaluation in Smart Electrical Utilization Systems,” 2016 IEEE Power and Energy Society General Meeting (PESGM), Boston, MA, pp:1–5. https://doi.org/10.1109/PESGM.2016.7741067.
Goodrum PM, McLaren MA and Durfee A (2006), “The Application of Active Radio Frequency Identification Technology for Tool Tracking on Construction Job Sites,” Automation in Construction, 15(3): 292–302. https://doi.org/10.1016/j.autcon.2005.06.004.
Guha-Sapir D, Vos F, Below R and Ponserre S (2011), “Annual Disaster Statistical Review 2010: The Numbers and Trends,” Centre for Research on the Epidemiology of Disasters, Université catholique de Louvain, Brussels, pp.12, http://www.cred.be/sites/default/files/ADSR_2010.pdf.
Hamledari H, McCabe B, Davari S and Shahi A (2017), “Automated Schedule and Progress Updating of IFC-Based 4D BIMs,” Journal of Computing in Civil Engineering, 31(4): 04017012. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000660.
Hilfert T and König M (2016), “Low-Cost Virtual Reality Environment for Engineering and Construction,” Visualization in Engineering, 4(1): 2. https://doi.org/10.1186/s40327-015-0031-5.
Hofer L, Zampieri P, Zanini MA, Faleschini F and Pellegrino C (2018), “Seismic Damage Survey and Empirical Fragility Curves for Churches after the August 24, 2016 Central Italy Earthquake,” Soil Dynamics and Earthquake Engineering, 111: 98–109. https://doi.org/10.1016/j.soildyn.2018.02.013.
Hu SQ, Sun BT and Wang DM (2010), “A Method for Earthquake Damage Prediction of Building Group Considering Building Vulnerability Classification,” Key Engineering Materials, 217–220. https://doi.org/10.4028/www.scientific.net/KEM.452-153.217.
Jahan A, Bahraminasab M and Edwards K (2012), “A Target-Based Normalization Technique for Materials Selection,” Materials and Design, 35: 647–54. https://doi.org/10.1016/j.matdes.2011.09.005.
Kalyan T, Zadeh P, Staub-French S, and Froese T (2016), “Construction Quality Assessment Using 3D As-Built Models Generated with Project Tango,” Procedia Engineering, 145: 1416–1423. https://doi.org/10.1016/j.proeng.2016.04.178.
Koliou M and Lindt JW (2020), “Development of Building Restoration Functions for Use in Community Recovery Planning to Tornadoes,” Natural Hazards Review, 21(2): 04020004. https://doi.org/10.1061/(ASCE)NH.1527-6996.0000361.
Lee G and Kim J (2014), “Parallel vs. Sequential Cascading MEP Coordination Strategies: A Pharmaceutical Building Case Study,” Automation in Construction, 43: 170–179. https://doi.org/10.1016/j.autcon.2014.03.004.
Li D, Yi C and Lu M (2017), “Automation of Project Planning and Resource Scheduling on a Rough Grading Project,” In ASCE International Workshop on Computing in Civil Engineering, pp. 376–383. https://doi.org/10.1061/9780784480847.047.
Lin CC, Wang WC and Yu WD (2008), “Improving AHP for Construction with an Adaptive AHP Approach (A3),” Automation in Construction, 17(2): 180–187. https://doi.org/10.1016/j.autcon.2007.03.004.
Lin PH and Wang NY (2017), “Stochastic Post-Disaster Functionality Recovery of Community Building Portfolios I: Modeling,” Structural Safety, 69: 96–105. https://doi.org/10.1016/j.strusafe.2017.05.002.
Liu GF; Zhou Z and Xu MZ (2018), “Interval Grey Fuzzy Uncertain Linguistic Sets and Their Application to Ranking of Construction Project Risk Factors,” Journal of Highway and Transportation Research and Development, 12(2): 73–80. https://doi.org/10.1061/JHTRCQ.0000628.
Longman M and Miles SB (2019), “Using Discrete Event Simulation to Build a Housing Recovery Simulation Model for the 2015 Nepal Earthquake,” International Journal of Disaster Risk Reduction, 35: 101075. https://doi.org/10.1016/j.ijdrr.2019.101075.
Lounis Z and McAllister TP (2016), “Risk-Based Decision Making for Sustainable and Resilient Infrastructure Systems,” Journal of Structural Engineering-Asce, 142(9): F401 6005. https://doi.org/10.1061/(ASCE)ST.1943-541X.0001545.
Lu Q, Won J and Cheng JCP (2016), “A Financial Decision Making Framework for Construction Projects Based on 5D Building Information Modeling (BIM),” International Journal of Project Management, 34(1): 3–21. https://doi.org/10.1016/j.ijproman.2015.09.004.
Ministry of Housing and Urban-Rural Development of the People’s Republic of China (MOHURD) (2009), “Labour Productivity Standards for Construction Works,” China Planning Press, Beijing, China. (ISBN: 9788017717104) (in Chinese)
Mohammadi S, Tavakolan M and Zahraie B (2016), “Automated Planning of Building Construction Considering the Amount of Available Floor Formwork,” In Construction Research Congress, pp. 2197–2206. https://doi.org/10.1061/9780784479827.219.
Nguyen TH (2005), “Automated Construction Planning for Multi-Story Buildings,” In Construction Research Congress 2005: Broadening Perspectives, pp. 1–10. https://doi.org/10.1061/40754(183)118.
Park J and Cai H (2015), “Automatic Construction Schedule Generation Method through BIM Model Creation,” 2015 International Workshop on Computing in Civil Engineering, pp. 620–627. https://doi.org/10.1061/9780784479247.077.
Powell GH and Allahabadi R (1988), “Seismic Damage Prediction by Deterministic Methods: Concepts and Procedures,” Earthquake Engineering & Structural Dynamics, 16(5): 719–734. https://doi.org/10.1002/eqe.4290160507.
Scheuer C, Keoleian G and Reppe P (2003), “Life Cycle Energy and Environmental Performance of a New University Building: Modeling Challenges and Design Implications,” Energy and Buildings, 35(10): 1049–1064. https://doi.org/10.1016/S0378-7788(03)00066-5.
Tauscher E, Smarsly K, König M and Beucke K (2014), “Automated Generation of Construction Sequences Using Building Information Models,” In Proceedings of the 31st International Conference of CIB W78, Orlando, Florida, USA, 23–25 June, pp. 745–752. https://doi.org/10.1061/9780784413616.093.
Torres-Calderon W, Chi Y, Amer F and Golparvar-Fard M (2019), “Automated Mining of Construction Schedules for Easy and Quick Assembly of 4D BIM Simulations,” In ASCE International Conference on Computing in Civil Engineering 2019: Visualization, Information Modeling, and Simulation, I3CE 2019, pp. 432–438. https://doi.org/10.1061/9780784482421.055.
Wan SP and Dong JY (2014), “A Possibility Degree Method for Interval-Valued Intuitionistic Fuzzy Multi-Attribute Group Decision Making,” Journal of Computer and System Sciences, 80: 237–256. https://doi.org/10.1016/j.jcss.2013.07.007.
Wang B and Liu J (2019), “Comprehensive Evaluation and Analysis of Maritime Soft Power Based on the Entropy Weight Method (EWM),” Journal of Physics: Conference Series, 1168. https://doi.org/10.1088/1742-6596/1168/3/032108.
Wang S (2013), “Integrated Digital Building Delivery System Based on BIM and VR Technology,” Applied Mechanics and Materials, pp. 3193–3197. https://doi.org/10.4028/www.scientific.net/AMM.380-384.3193.
Wang YM, Yang JB and Xu DL (2005), “A Two-Stage Logarithmic Goal Programming Method for Generating Weights from Interval Comparison Matrices,” Fuzzy Sets and Systems, 152(3): 475–498. https://doi.org/10.1016/j.fss.2004.10.020.
Wen Y (2015), “Research on Cost Control of Construction Project Based on the Theory of Lean Construction and BIM: Case Study,” The Open Construction and Building Technology Journal, 8(1): 382–88. https://doi.org/10.2174/1874836801408010382.
Wu YH, Zhu W, Li XQ and Gao R (1995), “Interval Approach To Analysis of Hierarchy Process,” Journal of Tianjin University, 1995(05): 700–705. https://kns.cnki.net/kcms/detail/detail.aspx?FileName=TJDX505.021&DbName=CJFQ1995. (in Chinese)
Xiong C, Lu XZ, Lin XC, Xu Z and Ye LP (2017), “Parameter Determination and Damage Assessment for THA-Based Regional Seismic Damage Prediction of Multi-Story Buildings,” Journal of Earthquake Engineering, 21(3): 461–485. https://doi.org/10.1080/13632469.2016.1160009.
Xiong C, Huang J and Lu XZ (2020), “Framework for City-Scale Building Seismic Resilience Simulation and Repair Scheduling with Labor Constraints Driven by Time-History Analysis,” Computer-Aided Civil and Infrastructure Engineering, 35(4): 322–341. https://doi.org/10.1111/mice.12496.
Xu J (2017), “Research on Application of BIM 5D Technology in Central Grand Project,” Procedia Engineering, 174: 600–610. https://doi.org/10.1016/j.proeng.2017.01.194.
Xu Z, Zhang HZ, Lu XZ, Xu YJ, Zhang ZC and Li Y (2019), “A Prediction Method of Building Seismic Loss Based on BIM and FEMA P-58,” Automation in Construction, 102: 245–257. https://doi.org/10.1016/j.autcon.2019.02.017.
Yang YM, Peng JX, Cai CS and Zhang JR (2019), “Improved Interval Evidence Theory-Based Fuzzy AHP Approach for Comprehensive Condition Assessment of Long-Span PSC Continuous Box-Girder Bridges,” Journal of Bridge Engineering, 24(12): 04019113. https://doi.org/10.1061/(ASCE)BE.1943-5592.0001494.
Ye J (2015), “Multiple Attribute Decision-Making Method Based on the Possibility Degree Ranking Method and Ordered Weighted Aggregation Operators of Interval Neutrosophic Numbers,” Journal of Intelligent and Fuzzy Systems, 28(3): 1307–1317. https://doi.org/10.3233/IFS-141416.
Yeoh JKW, Nguyen TQ and Abbott ELS (2017), “Construction Method Models Using Context Aware Construction Requirements for Automated Schedule Generation,” In ASCE International Workshop on Computing in Civil Engineering 2017, pp. 60–67. https://doi.org/10.1061/9780784480847.008.
Yu YX and Zheng ZH (2004), “Application of Paterkovsky Method in Organizing Non-rhythmic Flowing Water Construction,” Shanxi Architecture, 30(18): 90–91. https://doi.org/10.13719/j.cnki.cn14-1279/tu.2004.18.057. (in Chinese)
Yue JG, Qian J and Beskos DE (2016), “A Generalized Multi-Level Seismic Damage Model for RC Framed Structures,” Soil Dynamics and Earthquake Engineering, 80: 25–39. https://doi.org/10.1016/j.soildyn.2015.10.005.
Yun SH, Jun KH, Son CB and Kim SC (2014), “Preliminary Study for Performance Analysis of BIM-Based Building Construction Simulation System,” Ksce Journal of Civil Engineering, 18(2): 531–540. https://doi.org/10.1007/s12205-014-0174-2.
Zhou Y, Ding LY, Wang XY, Truijens M and Luo HB (2015), “Applicability of 4D Modeling for Resource Allocation in Mega Liquefied Natural Gas Plant Construction,” Automation in Construction, 50: 50–63. https://doi.org/10.1016/j.autcon.2014.10.016.
Zhu BQ and Song WX (2016), “Study on the Flow Construction,” Journal of Anyang Institute of Technology, 15(02): 51–53. https://doi.org/10.19329/j.cnki.1673-2928.2016.02.014. (in Chinese)
Acknowledgement
The authors are grateful for the financial support received from Scientific Research Fund of Institute of Engineering Mechanics, China Earthquake Administration (Grant No. 2019EEEVL0501), General Program of the National Natural Science Foundation of China (Grant No. 51978049) and Beijing Nova Program of Science and Technology (Grant No. Z191100001119115).
Author information
Authors and Affiliations
Corresponding author
Additional information
Supported by: Scientific Research Fund of Institute of Engineering Mechanics, China Earthquake Administration under Grant No. 2019EEEVL0501, General Program of the National Natural Science Foundation of China under Grant No. 51978049 and Beijing Nova Program of Science and Technology under Grant No. Z191100001119115
Rights and permissions
About this article
Cite this article
Zhen, X., Furong, Z., Wei, J. et al. A 5D simulation method on post-earthquake repair process of buildings based on BIM. Earthq. Eng. Eng. Vib. 19, 541–560 (2020). https://doi.org/10.1007/s11803-020-0579-5
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s11803-020-0579-5