Skip to main content
Log in

Simulation of the Process of Implementation of an Intelligent Electric Power Metering System

  • Published:
Russian Electrical Engineering Aims and scope Submit manuscript

Abstract

In the next few years, a large-scale project on implementation of an intelligent system for electric power metering should be carried out in Russia. The replacement of electric meters for individual customers is a necessary part of this project. The number of people needed to carry out the project within the specified period has to be found. It should be taken into account than electric meters, like any electrical equipment, are subject to failure. If a system for their prompt restoration is not developed, the incorporation of an intelligent system of electric power metering will have no effect. The classical queuing analysis based on calculation of the probabilities of a system being in different states can hardly be used because of the problem’s dimensionality. Methods of simulation describe specific cases. They do not provide solution of the problem without analytically determined approximations of the number of people needed. This paper considers the solution of the problem of determining the number of personnel needed for the program of replacing electric meters to be done in proper time, taking into account the that they need to be restored promptly. The solution has been obtained based on the simulations of the incorporation of an intelligent system of electric power metering using the method of average dynamics. An example of calculations of the necessary number of employees in MathCAD PRIME 4.0 has been considered. The suggested method provides almost exact results because of the large number of replaced electric meters.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Institutional subscriptions

Fig. 1.
Fig. 2.
Fig. 3.
Fig. 4.

Similar content being viewed by others

REFERENCES

  1. Federal Law no. 522-FZ of December 27, 2018 “On Amending Certain Legislative Acts of the Russian Federation in Connection with the Development of the Registering System of Electric Energy (Power) in the Russian Federation.” http://www.consultant.ru. Accessed February 4, 2019.

  2. Italy almost completely switched to smart electricity meters. https://miaitalia.info/view_news_italy.php?id=2026. Accessed February 4, 2019

  3. Shadrina, T., Reverse current, Rossiiskaya Gazeta. Stolichnyi Vyp., 2018, no. 76 (7242).

  4. Lokhmanov, V.M. and Maron, A.I., Determination of the economically reqired number of personnel and spare parts, tools and accessories for complex systems in the electric power industry, Vestn. Mosk. Akad. Rynka Truda Inf. Tekhnol., 2002, no. 4.

  5. Wentzel, E.S., Operations Research: A Methodological Approach, Moscow: Mir, 1983.

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Yu. M. In’kov.

Additional information

Translated by M. Astrov

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

In’kov, Y.M., Rozenberg, E.N. & Maron, A.I. Simulation of the Process of Implementation of an Intelligent Electric Power Metering System. Russ. Electr. Engin. 91, 65–68 (2020). https://doi.org/10.3103/S1068371220010046

Download citation

  • Received:

  • Revised:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.3103/S1068371220010046

Keywords:

Navigation