1 Introduction

Gob-side entry retaining (GER) refers to maintaining either headentry or tailentry behind the working face by constructing a fill-in sidewall on the gob side with special support to be reused for the next panel [1, 2]. This technology has obvious advantages in improving coal recovery, and reducing roadway development, while solving the problem of gas accumulation at the upper corner [3, 4]. According to the different roadside supports, the GER can be divided into the traditional gob-side entry retaining by packing (GERP) and gob-side entry retaining by roof cutting (GERRC). The GERP means that the packed gangue, concrete, or high water material along the edge of the gob is used as roadside support during the process of mining [5,6,7,8,9]. The GERRC entails cutting the roof at the edge of the gob and using the mine pressure for caving and forming the roadway [10].

The GERP has been developed for more than 30 years and has achieved many beneficial results in terms of roadway stability control [11, 12], roof structure movement [13,14,15,16], and packing body mechanical properties [17, 18]. For a steeply pitching seam (35°~55°), the natural stop angle of gangue in the gob is less than the coal seam dip angle, and thus, the gangue will naturally roll and accumulate in the lower end of the working face. The falling gangue has a great impact force and often causes personal injury, limiting the application of the GER in a coal seam with a steeply pitching seam [19].

The GERRC is a new technology proposed within the last 5 years. With the popularization and application of the “110 construction method” (meaning that only the first working face in the mining area just needs one advanced roadway excavation; the other following working faces do not need advanced roadway excavation by using the GERRC technology) [20], the technology and relevant theories of the GERRC are gradually being developed. M.C. He and co-workers [21,22,23] put forward the idea of the GERRC and developed related supporting equipment. Sun et al. [24] studied the key technology of roof cutting in the thin coal seam. Gao et al. [25] analyzed the influence of roof cutting on roof collapse. Wang et al. [26] found that the surrounding rock stress of the GERRC is significantly less than that of the GERP. At present, the GERRC is mainly applied in near-horizontal coal seams and rarely in steeply pitching seams.

Based on the unique characteristics of gangue rolling and accumulating in the gob of steeply pitching seams, this paper proposes an innovative method, the GERRC in steeply pitching seams. A comparative analysis between the GERRC and the traditional GERP shows that the GERRC is not only better than the GERP with regard to the roof structure of the roadway but can also turn the disadvantages of the gangue rolling impact into the advantages of roadside support. The technological process of the GERRC in a steeply pitching seam is described in detail and tested in the Chang Gouyu Coal Mine.

2 Roof Structure of the GERP and its Limitations in the Steeply Pitching Seam

2.1 Hard Roof Breaking Position

Previous studies [27] have shown that with the advance of the working face, the first weighting of the roof is “O-X” breaking (the broken line of the roof at the edge of the gob is O-shaped inside the gob X-shape, as shown in the red dotted line in Fig. 1a), and the periodic weighting on both ends of the working face forms an arc triangle. When the arc triangular block reaches the limited span and the side support of the roadway does not play an effective supporting role, the arc triangular block is easy to break at the solid coal side. The GERP is under the arc triangle (Fig. 1b).

Fig. 1
figure 1

Main roof “O-X” breaking pattern: a top view, the A-A line is the vertical section of roof and b vertical section of roof

2.2 Roof Structural Evolution of the GERP

The roof structural model of the GERP is shown in Fig. 2. According to the different roof structures of the GERP, the roadway can be divided into three areas: advance area of the working face (area I), arc triangle block unbroken area in the gob (area II), and arc triangle block broken area in the gob (area III). In area I, the roof above the roadway is not broken, and thus, the roof structure is a clamped-clamped beam (Fig. 2(a)). In area II, the roof of the roadway is intact above the coal pillars and broken on the side of the gob, and thus, the roof structure is a long cantilever beam with one side fixed and the other side free (Fig. 2(b)). In area III, the roof is broken on the side of the coal pillar with the weight of the overburden completely borne by the roadside support and the coal pillar, and thus, the roof structure is a simply supported beam (Fig. 2(c)). The longer the cantilever is, the greater the stress that the roadside support needs to bear is, and thus, the worse the roadway stability is. The length of area II can be calculated by Eq. 1 [28]:

$$ {L}_{\mathrm{max}}=\frac{\sqrt{2}h}{2}\sqrt{\frac{4{R}_t}{q\cos \alpha }-\frac{\tan^2\alpha }{3}} $$
(1)

where Lmax is the limited span of the arc triangle block, m; h is the thickness of the roof, m; α is the dip of the coal seam, °; q is the uniform load of the overburden, MPa; and Rt is the tensile strength of the roof, MPa.

Fig. 2
figure 2

The roof structural evolution of the GERP: (a) fixed-end, (b) long cantilever beam, and (c) simply supported beam. qi (i = 1, 2, 3) is the uniform load of the overlying strata

2.3 Limitations of the GERP in a Steeply Pitching Seam

In the working face of a steeply pitching seam with hard roof, the roof easily produces a large area of suspended roof at the lower end of the face. The falling gangue is in the middle, and the upper part, of the gob slides and rolls toward the lower part of the working face. After the acceleration of the falling gangue caused by the inclined length of the working face, the supporting structure of the roadway is destroyed by the great impact force. The falling gangue frequently causes accidents and economic loss, which limits the application of GERP in steeply pitching seams. Three gangue rolling accidents happened when the GERP was used in the 1501 working face, including two minor injury accidents and one serious injury accident.

The movement of the falling gangue in the middle and upper parts of the gob can be divided into three stages, i.e., free falling stage, sliding stage, and rolling stage. The impact force of gangue in the rolling stage is the largest, as shown in Fig. 3.

Fig. 3
figure 3

Movement process of falling gangue

3 GERRC in Steeply Pitching Seam

In the working face with hard roof, the area of the suspended roof in the gob is large. The falling gangue in the middle and upper parts of the gob can directly impact the roadside support and rush into the transportation roadway of the working face. How to effectively avoid the impact of falling gangue in the middle and upper parts of the gob on the roadside support is the key to the problem. Based on the analysis of the caving characteristics of the hard roof in the steeply pitching seam and the technology of roof cutting, the method of the GERRC in a steeply pitching seam is put forward.

3.1 Technical Principle of the GERRC

The hard roof at a certain distance to the front of the working face of the transport roadway is cut so that the hard roof at the lower end of the working face will fall with mining. The falling gangue is close to the roadside support, and in the free falling stage, the impact force on the roadside support is the smallest. The falling gangue piles up in the lower part of the working face under the action of the roadside support and is in a loose state, which buffers the falling gangue in the middle and upper parts of the gob and reduces its impact on the roadside support (Fig. 4a).

Fig. 4
figure 4

Technical principle of the GERRC: a falling gangue piles up and b it compacts the accumulated gangue

Under the action of overburden pressure, the lower main roof lags behind the immediate roof fracture along the cutting seam position and compacts the accumulated gangue. The compacted gangue has a certain bearing capacity, which supports the roof together with the roadside support body (Fig. 4b). The accumulated gangue can be easily compressed at the early gangue accumulation stage and has a strong bearing capacity in the later stage, which shows the self-bearing characteristic of “early flexible and later strong” [17]. Ultimately, the rock surrounding the roadway forms a steady-state control system consisting of gangue, a roof beam structure, and a solid coal wall.

3.2 Technical Process of the GERRC

The whole technological process of the GERRC in a steeply pitching seam is shown in the Fig. 5. The technical process of the GERRC is divided into three steps.

Fig. 5
figure 5

The technological process of the GERRC in a steeply pitching seam: a support, b cutting, and c protecting

First, the support step is described (Fig. 5a). In front of the working face, a row of constant resistance large-deformation anchor cables (CRLAC) is added near the working face to strengthen the roof support. The CRLAC mainly consists of the constant resistance body, steel strand, pallet, and lock set. When the force of the anchor cable is less than the constant resistance value, the steel strand is in an elastic working state. When the force is greater than the constant resistance value, the cone in the constant resistance casing slips along the inner wall of the casing, and at this time, the structural deformation of the constant resistance device is used to resist the applied load until the surrounding rock is stable again. The principles of the CRLAC and constant resistance yield characteristics are shown in Fig. 6 [25]. The maximum working resistance of the CRLAC is 350 kN, and the allowable maximum deformation is 400 mm.

Fig. 6
figure 6

CRLAC principle and resistance yield characteristics: a principle of the CRLAC and b constant resistance yield characteristic curve

Second, the cutting step is described (Fig. 5b). In front of the working face, the blasting borehole is set near the working face, and the charging blasting is carried out to cut off the hard roof. The blasting uses an energy gathering tube (EGT) to form directional cracks after blasting. The height of the roof cutting should be greater than that of the collapsed roof required for filling in the gob and is related to the collapse and height of the rock. The cutting angle should make the rock strata fall directly without forming a hinged structure. The EGT is shown in Fig. 7. The calculation formula of the cutting height is as follows [24]:

$$ H=\frac{m_0}{k-1} $$
(2)

where H is the cutting height required for filling in the gob, m; m0 is the mining height of the coal seam, m; and k is the initial coefficient of bulk increase, generally, 1.25–1.35.

Fig. 7
figure 7

Energy gathering tube (EGT)

Third, the protecting step is described (Fig. 5c). After the work surface is advanced, the serried single props are used timely behind the working face as a gangue blocking device and roadside strengthening support. The broken gangue rolls down to the lower part of the working face due to gravity, resulting in a lateral impact force. The gangue blocking device resists this lateral deformation. In addition, since the supporting structures concentrate near the slit side, the sinking on the slit side is more obvious than that on the solid coal side. Therefore, the roadside support undergoes a certain degree of yielding. The working characteristics of the single prop is shown in Fig. 8 [27]. When the force exceeds the working resistance, hydraulic fluid will leak out of the prop, and the length of the prop will shorten. The prop exhibits excellent resistance to constant pressure and bending. The working resistance of those props is 300 kN.

Fig. 8
figure 8

Working characteristics of the single hydraulic prop: a single hydraulic prop and b working characteristics. PN is the normal working resistance

3.3 Roof Structural Evolution of the GREEC

As shown in Fig. 9, the roof beam successively undergoes four states: clamped-clamped beam, one-time statically indeterminate beam with one side fixed and the other simply supported, short cantilever beam, and one-time statically indeterminate beam with one side fixed and the other simply supported. According to the different connection states between the roadway roof and the both sides of the roadway, the GERRC is divided into four areas: ahead of the working face (area I), roof cutting (area II), dynamic pressure (area III), and pressure stabilization (area IV).

Fig. 9
figure 9

Roof structural evolution of the GERRC: (a) fixed-end, (b) one-time statically indeterminate beam with one side fixed and the other simply supported, (c) short cantilever, and (d) one-time statically indeterminate beam with one side fixed and the other simply supported. qi′ (i = 1, 2, 3, 4) is the uniform load of the overlying strata

3.4 Difference Analysis of the Roof Structures Between the GERP and the GERRC

Unlike the GERP, the roof structure of the GERRC has changed significantly. The roof beam changes from a long cantilever state simply supported on both sides to a short cantilever state with one side fixed and the other simply supported. At this time, the roof beam is in a one-time statically indeterminate state, which is more conducive to the stability of the roadway. According to the structural mechanics, the analysis is performed on the stresses of the simply supported inclined beam and one-time statically indeterminate inclined beam under a uniform load. The stress is shown in Fig. 2(c) and Fig. 9(d). The lengths of the beams in Fig. 2(c) and Fig. 9(d) are l1 and l2, respectively.

In a simply supported inclined beam, the force of the roadside support is

$$ {R}_A=\frac{q_3{l}_1}{2} $$
(3)

In a one-time statically indeterminate beam, the force of the roadside support is

$$ {R}_A\hbox{'}=\frac{3{q}_4\hbox{'}{l}_2}{8} $$
(4)

Assuming that q3 = q4″ = q, the stress of roadside support decreases.

$$ \Delta {R}_A=\frac{4{ql}_1-3{ql}_2}{8} $$
(5)

4 Case Study

4.1 Engineering Background

This paper takes the 1502 working face of the Chang Gouyu Coal Mine as a case study. The length and width of the 1502 working face are 199 m and 87 m, respectively (Fig. 10a). Number 15 coal is mined in working face 1502. It is anthracite with a high degree of coalification. It is not easy to self-ignite with a self-heating temperature of 650°. Coal dust is not explosive. Chang Gouyu Coal mine is low gas mine. The coal seam depth is 880–920 m, with an average thickness of 2.3 m and an average dip angle of 36° (Fig. 10b). The first immediate roof is a thin layer of carbonaceous siltstone, which can easily fall. The second immediate roof is a thick siltstone layer without fissure, which is difficult to make fall. The main roof is a breccia layer with a developed joint. The upper 1501 working face was mined in the inclined direction from the upper part to the lower part. The 1502 working face was mined by the method of comprehensive mechanization, with the roof managed by a caving method. The mining drilling histogram of the 1502 working face is shown in Fig. 10c.

Fig. 10
figure 10

Basic information of the 1502 working face of the Chang Gouyu Coal Mine: a working face mining engineering plan, b cut coal seam profile, and c drilling histogram

The physical and mechanical parameters of the no. 15 coal, roof, and floor rock blocks were obtained in the laboratory. Other rock formation parameters can be referenced from the geological exploration report and the similar rock blocks parameter database in the UDEC manual [29]. According to engineering experience, the parameters of the elastic modulus, cohesion, and tensile strength of the rock mass are 1/5 of the corresponding parameters of the rock blocks, and the Poisson ratio of the rock mass is 1.2 times that of the rock blocks [30]. The calculated physical and mechanical parameters of the rock masses are shown in Table 1.

Table 1 Physical and mechanical parameters of rock masses

The original support of the roadway is bolt and anchor cable support. The supporting parameters are shown in Fig. 11. The spacing and row spacing of roof bolting of the roadway roof are 1000 mm × 1000 mm, and those of the roadside are 1000 mm × 1000 mm. The spacing of the cable is 4000 mm.

Fig. 11
figure 11

Original support of the roadway: a cross-section diagram and b top view

Since the immediate roof is a thick and hard siltstone layer, the gob is prone to form a large area suspended roof. In the GERP of the 1501 working face, the rockfall in the middle and upper parts of the gob has a great impact on the side support of the roadway, and the bending rate of the serried single props reaches 58.3%.

4.2 Optimization of the Roof Cutting Angle

When the rock collapses due to cutting, the rock mass easily forms a hinge structure, especially in steeply pitching seams. Therefore, the optimization of the cutting angle is very important. In general, when cutting is vertical to the roadway roof, the scope of dangling is the smallest. However, the dynamic shear is easily generated in the process of gangue collapse, hindering the rock from falling. As the cutting angle increases, the contact area between the bulging gangue and the roof increases, and the support force of the roof is enhanced. This response increases the hanging range of the roof beam and has a negative effect on the entry being retained. A reasonable cutting angle is not only conducive to the roof falling in the gob but also optimizes the surrounding rock stress.

Based on the occurrence condition of the coal seam in the 1502 working face, the numerical simulations of surrounding rock stress with three cutting angles, perpendicular to the roof (dip angle of 127°), vertical (dip angle of 90°), and inclined to the gob direction (dip angle of 60°), are carried out by using the software UDEC 4.0. The initial model size is 120 m × 70 m. A fixed boundary is used on both sides and the bottom of the model. The vertical stress of 21 MPa is applied to the upper part (overburden gravity). It is found that when the cutting angle is 127° or 90°, the hinged structure is formed, which is not conducive to roof collapse (Fig. 12a, b); when the cutting angle is 60°, the roof is completely collapsed, and the roadside support resistance is less than 20 MPa (Fig. 12c).

Fig. 12
figure 12

Surrounding rock stress distribution with three cutting angles: a perpendicular to the roof (dip angle of 127°), b vertical (dip angle of 90°), and c inclined to the gob direction (dip angle of 60°)

4.3 Parameter Settings

According to the engineering geological conditions of the 1502 working face and the requirements of roadway surrounding rock control, the relative parameters are set as follows (Fig. 13):

  1. (1)

    Advanced support in headentry

Fig. 13
figure 13

Support design of the GERRC

Before cutting the roof, two rows of single props are added to strengthen the support at 30 m in front of the 1502 working face. The spacing and row spacing are 500 mm × 2000 mm. The upper side of the roadway is supported by single props and column caps, and the lower side is supported by single props and metal hinged top beams. A CRLAC is added between the two rows of bolts in the upper part of the roadway, and the CRLAC spacing is 1 m.

  1. (2)

    Blasting roof cutting

Roadway roof cutting adopts cumulative blasting. The charge method is hole bottom uncoupling continuous charge. The blasthole depth is 20 m with a cutting angle of 60° and a spacing of 0.5 m. The charge length is 18 m, and the sealing length 2 m. The cutting area is at 20 m in front of the working face.

  1. (3)

    Roadside support

Behind the powered support, the roadside of the GERRC is supported by serried single props with a column spacing of 0.3 m. To maintain the stability of serried single props and prevent them from being overwhelmed by gangue, the side supports, within 30 m behind the powered support, are added on the inside of the serried single props with a spacing of 2 m. The bush bundle is fixed on the outside of the serried single props, which buffers the gangue from slipping into the roadway. After the deformation of the roadway is stable, the side supports could be removed.

4.4 Analysis of the Effect of the GERRC

Three measurement points are arranged on the serried single props behind the 1502 working face to monitor the roadway pressure of the GERRC. These three measurement points are respectively arranged at 5 m, 20 m, and 30 m behind the working face. The support resistances of the serried single props are monitored in the mining process of the 1502 working face and shown in Fig. 14a. The KY-82 roof dynamic instrument is arranged at 5 m behind the working face to monitor the deformation of the roadway with time in the advancing process of the working face.

Fig. 14
figure 14

Monitoring of the prop support resistance and the deformation of the surrounding rock: a prop support resistance and b roof-to-floor convergence

The absolute roof-to-floor convergence is relatively large in the initial stage of GERRC and becomes stable later (Fig. 14b). The cumulative deformation of the roadway during the entire process of GERRC is 97 mm, which is small. The prop support resistances at these three measurement points range from 18 to 28 MPa during the observation period. Measurement point 1 (5 m) is in the dynamic pressure zone during GERRC. During the advancement of the 1502 working face, the support resistance of the prop increases abruptly on the 20th day, and the prop is in the stage of constant resistance and allowable displacement until the gangue exerts its effective bearing capacity. Measurement point 3 (30 m) is in the pressure stabilization zone, and the prop support resistance is basically maintained between 16 and 23 MPa. The actual application effect of GERRC is shown in Fig. 15.

Fig. 15
figure 15

GERC effects on the field application: a serried single props and b bush bundle and failing gangue

5 Conclusions

  1. (1)

    The movement process of the gangue in the gob of a steeply pitching seam is divided into three stages: free falling stage, sliding stage, and rolling stage. When the roof is hard, the roof in the lower part of the gob cannot easily fall, and the gangue in the middle and upper parts of the gob has a great impact on the side support of the roadway. By using the GERRC method, the roof in the lower part of the gob will fall with mining. The falling gangue in the lower part has little impact on the roadside support. It buffers the falling gangue in the middle and upper parts and supports the roof after compaction.

  2. (2)

    The roof structure of the GERRC is in a one-time statically indeterminate state with one side fixed support and the other simply support, which is more conducive to the stability of the roadway than the traditional GERP.

  3. (3)

    Taking the 1502 working face of the Chang Gouyu Coal Mine as a case study, after 50 days of observation, we found that the total deformation of the roadway is 97 mm, the support resistances of the three measurement points behind the working face are in the range of 18~28 MPa, the single hydraulic prop does not show obvious bending and breaking phenomenon, and the size of the GERRC fulfills the requirements of mine ventilation and transportation.