Skip to main content
Log in

Two-machine flow shops with an optimal permutation schedule under a storage constraint

  • Published:
Journal of Scheduling Aims and scope Submit manuscript

Abstract

We consider two-machine flow shop scheduling problems with storage to minimize the makespan. Under a storage constraint, each job has its own size, and the total size of the job(s) being processed on the machine(s) and the job(s) waiting for the second operation cannot exceed the given capacity. It is known that the computational complexity is strongly NP-hard and in general an optimal schedule does not exist in the set of schedules with the same job sequences on two machines, referred to as a permutation set. Thus, we consider two cases such that an optimal schedule exists in the permutation set. These two cases have the special structure of processing times. In the first case, the processing times of two machines for each job are identical, while in the second case, machine 2 dominates machine 1, that is, the smallest processing time of the second group of operations is larger than or equal to the largest one of the first group of operations. We show that the first case is strongly NP-hard and admits a polynomial-time approximation scheme (PTAS), while the second case is solved in polynomial time.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4

Similar content being viewed by others

References

  • Chekuri, C., & Khanna, S. (2005). A polynomial time approximation scheme for the multiple Knapsack problem. SIAM Journal on Computing, 35, 713–728.

    Article  Google Scholar 

  • Fung, J., & Zinder, Y. (2016). Permutation schedules for a two-machine flow shop with storage. Operations Research Letters, 44, 153–157.

    Article  Google Scholar 

  • Kononov, A., Hong, J. S., Kononova, P. K., & Lin, F. C. (2012). Quantity-based buffer-constrained two-machine flowshop problem: Active and passive prefetch models for multimedia applications. Journal of Scheduling, 15, 487–497.

    Article  Google Scholar 

  • Kononova, P. A., & Kochetov, Y. A. (2013). The variable neighborhood search for the two machine flow shop problem with a passive prefetch. Journal of Applied and Industrial Mathematics, 7, 54–67.

    Article  Google Scholar 

  • Lina, F.-C., Honga, J.-S., & Lin, B. M. T. (2009). A two-machine flowshop problem with processing time-dependent buffer constraints. An application in multimedia presentations. Computers & Operations Research, 36, 1158–1175.

    Article  Google Scholar 

Download references

Acknowledgements

The first author’s work was supported by a Grant from Incheon National University in 2017 (2017-0484).

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Myoung-Ju Park.

Additional information

Publisher's Note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Min, Y., Choi, BC. & Park, MJ. Two-machine flow shops with an optimal permutation schedule under a storage constraint. J Sched 23, 327–336 (2020). https://doi.org/10.1007/s10951-019-00608-8

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10951-019-00608-8

Keywords

Navigation