Molybdenite Concentrate Purification by a Continuous Sulfation-Leaching Process
Mining, Metallurgy & Exploration ( IF 1.9 ) Pub Date : 2022-06-14 , DOI: 10.1007/s42461-022-00628-7
I. Wilkomirsky, J. Becker, F. Parada

Purification of molybdenite concentrate from copper concentrates was performed by sulfation. The sulfation of molybdenite concentrates was carried out with pure sulfuric acid (> 96%) at 160–190 °C to study the influence of the reaction temperature and reaction time on the residual copper in the molybdenite concentrates. A purified concentrate with less than 0.1 wt% copper and low levels of other metals were obtained. For up to 7.1 wt% copper, the conditions required are a temperature of 190 °C, a reaction time of 14 h, and a moly/acid weight ratio of 1/1. Furthermore, several designs of sulfation reactors were evaluated in order to obtain the desired level of copper in the product and to analyze the influence of the operational and design parameters on the reactor dispersion number (Le). The basic design for an 80-t/day plant fed with 4 wt% copper molybdenite concentrate requires five backmixed reactors in series, each measuring 8 m3, operating at 190 °C and with a reaction time of 10 h. The reactor must be protected against severe corrosion by the hot sulfuric acid with either Teflon, glass or ceramic.



中文翻译:

连续硫酸化-浸出法提纯辉钼精矿

通过硫酸化从铜精矿中提纯辉钼矿精矿。在 160–190 °C 下用纯硫酸 (> 96%) 对辉钼精矿进行硫酸化,以研究反应温度和反应时间对辉钼精矿中残留铜的影响。获得了铜含量低于 0.1 wt% 和其他金属含量低的纯化精矿。对于高达 7.1 wt% 的铜,所需的条件是 190 °C 的温度、14 小时的反应时间和 1/1 的钼/酸重量比。此外,评估了几种硫酸化反应器设计,以获得产品中所需的铜含量,并分析操作和设计参数对反应器分散数 (Le) 的影响。3,在190°C下操作,反应时间为10小时。必须使用特氟隆、玻璃或陶瓷保护反应器免受热硫酸的严重腐蚀。