当前位置: X-MOL 学术Ferroelectrics › 论文详情
Our official English website, www.x-mol.net, welcomes your feedback! (Note: you will need to create a separate account there.)
Construction design and construction scheme of prefabricated box girder
Ferroelectrics ( IF 0.8 ) Pub Date : 2021-09-09 , DOI: 10.1080/00150193.2021.1905742
Fangfei Dong 1 , Sheng Zhou 2
Affiliation  

Abstract

Construction organization design applicable to China Railway 12 Bureau Group Co., Ltd. Mimeng Railway Kaiyuan beam yard (scope of supply DK54 ∼DK83 000 866) Prefabrication of 270-hole box girders (32 m 237 holes, 24 m (33 holes), Including Kai Dian 1 double-line bridge, Kai Dian 2 double-line super bridge, Kai Dian 3 double-line bridge, Kai Dian 4 double-line bridge, Kai Dian 5 double-line bridge, Nanpanjiang double-line bridge, Lujiang double-line super bridge, Tujia black double-line bridge, Yu San 1 double-line bridge, Yu San 2 double-line bridge, Ya Le double-line bridge, Gan Tangzi super bridge, Longxi dam Lengshuigou double-line super bridge, Yulin Mountain double-line middle bridge, Nandong 1 double-line super bridge, Nandong 2 double-line bridge, Nandong 3 double-line bridge and Nandong 4 double-line bridge.



中文翻译:

装配式箱梁施工设计与施工方案

摘要

适用于中铁十二局集团有限公司米盟铁路开元梁场的施工组织设计(供货范围DK54~DK83 000 866) 270孔箱梁预制(32 m 237孔、24 m(33孔)、包括开店1号双线桥、开店2号双线特级桥、开店3号双线桥、开店4号双线桥、开店5号双线桥、南盘江双线桥、庐江双线桥-线特大桥、土家黑双线桥、玉三1双线桥、玉三2双线桥、雅乐双线桥、甘塘子特大桥、陇西大坝冷水沟双线特大桥、榆林山地双线中桥、南东一号双线特级桥、南东二号双线桥、南东三号双线桥、南东四号双线桥。

更新日期:2021-09-10
down
wechat
bug