当前位置: X-MOL 学术Atom. Energy › 论文详情
Our official English website, www.x-mol.net, welcomes your feedback! (Note: you will need to create a separate account there.)
NFC Russia Infrastructure Readiness Assessment for Development of PSKD-600 Power Reactors
Atomic Energy ( IF 0.5 ) Pub Date : 2021-08-25 , DOI: 10.1007/s10512-021-00764-1
P. N. Alekseev 1 , M. V. Kormilitsyn 1 , L. A. Kormilitsyna 1 , S. B. Pustovalov 1 , A. A. Sedov 1 , S. A. Subbotin 1 , P. A. Fomichenko 1
Affiliation  

An implementation assessment of PSKD-600 type power reactors was made. It was established that the readiness level of all PSKD-600 nuclear fuel cycle technologies is no lower than TRL5, and most correspond to readiness level no lower than TRL7, i.e., the basic technological solutions were also demonstrated under actual industrial conditions. The relevant R&D should be aimed at large-scale industrial implementation of technologies. The analysis showed that there are no fundamental constraints on the integration into the NFC infrastructure of a complex of interconnected technological objects that secure the operation of PSKD-600. Thus, the PSKD-600 reactor stock can be unrolled on the existing technological base.



中文翻译:

NFC 俄罗斯基础设施就绪评估,用于开发 PSKD-600 动力反应堆

对 PSKD-600 型动力堆的实施情况进行了评估。确定所有PSKD-600核燃料循环技术的准备水平不低于TRL5,大部分对应不低于TRL7的准备水平,即基本技术方案也在实际工业条件下得到验证。相关研发应着眼于技术的大规模产业化实施。分析表明,对于确保 PSKD-600 运行的互连技术对象的复杂性,集成到 NFC 基础设施中没有基本限制。因此,PSKD-600 反应堆库存可以在现有技术基础上展开。

更新日期:2021-08-26
down
wechat
bug