当前位置: X-MOL 学术Microgravity Sci. Technol. › 论文详情
Our official English website, www.x-mol.net, welcomes your feedback! (Note: you will need to create a separate account there.)
Tsinghua University Freefall Facility (TUFF): A 2.2 Second Drop Tunnel for Microgravity Research
Microgravity Science and Technology ( IF 1.8 ) Pub Date : 2021-03-25 , DOI: 10.1007/s12217-021-09877-5
Lei Luo , Hengyi Zhou , Yuhang Sun , Wenyi Zhang , Tao Chen , Shuqing Chen , Yuzhe Wen , Shilong Xu , Suyuan Yu , Yu Cheng Liu

Ground-based freefall facilities are to create microgravity environment on earth for studying the space-related or fundamental sciences, which have been widely used in the field of combustion, fluid, physics and material sciences. Aiming to serve for the broader microgravity science and preliminary tests for projects onboard the upcoming assembly of Chinese Space Station, a 2.2 second freefall facility was designed and built in the Lee Shau Kee Science and Technology Building on the campus of Tsinghua University in Beijing. This facility is composed of five systems: (I) freefall tunnel and safety cables; (II) release and retrieve system; (III) the capsule; (IV) brake system; (V) electrical control and safety interlock system. The capsule consists of an outer drag shield and an inner rig of which the total weight is 280 kg. The capsule is released by a pneumatic chuck that minimizes disturbance of the release operation. The eddy current brake modules made of several permanent magnets are applied to decelerate the capsule without power supply. This paper primarily discusses the tests designed and conducted to characterize the performance of such facility in many aspects. The results show that during freefall, the microgravity level of 10-3 g can be achieved for 2.2 second. Concerning movement of the inner rig relative to the drag shield during freefall, the clearance of 0.43 m and relative velocity of 0.62 m/s were specified. The deceleration can be controlled within 15 g. The terminal velocity of capsule in the brake system ranges from 0.4 to 0.5 m/s depending on the actual weight of capsule. The noise level in the entrance section of brake system is about 75.6 dB. The duration of this noise is very short (<1 s), suggesting that the operation of facility is environmentally friendly to the operators and people working in the building.

更新日期:2021-03-25
down
wechat
bug