Journal of Applied Statistics ( IF 1.5 ) Pub Date : 2021-03-16 , DOI: 10.1080/02664763.2021.1900798 Michael Pokojovy 1 , J Marcus Jobe 2
We present a novel real-time univariate monitoring scheme for detecting a sustained departure of a process mean from some given standard assuming a constant variance. Our proposed stopping rule is based on the total variation of a nonparametric taut string estimator of the process mean and is designed to provide a desired average run length for an in-control situation. Compared to the more prominent CUSUM fast initial response (FIR) methodology and allowing for a restart following a false alarm, the proposed two-sided taut string (TS) scheme produces a significant reduction in average run length for a wide range of changes in the mean that occur at or immediately after process monitoring begins. A decision rule for when to choose our proposed TS chart compared to the CUSUM FIR chart that takes into account both false alarm rate and average run length to detect a shift in the mean is proposed and implemented. Supplementary materials are available online.
中文翻译:
带紧弦的单变量快速初始响应统计过程控制
我们提出了一种新颖的实时单变量监控方案,用于检测过程均值与某个给定标准的持续偏离,假设方差恒定。我们提出的停止规则基于过程均值的非参数紧弦估计量的总变化,旨在为受控情况提供所需的平均运行长度。与更突出的 CUSUM 快速初始响应 (FIR) 方法相比,并允许在出现错误警报后重新启动,所提出的两侧拉紧弦 (TS) 方案可显着减少平均游程长度,以适应各种变化。意味着在过程监控开始时或之后立即发生。与 CUSUM FIR 图相比,何时选择我们提出的 TS 图的决策规则提出并实施,该规则同时考虑了误报率和平均运行长度以检测均值的变化。补充材料可在线获取。