Utilities Policy ( IF 4 ) Pub Date : 2021-03-14 , DOI: 10.1016/j.jup.2020.101136 Björn Felten , Paul Osinski , Tim Felling , Christoph Weber
Significant welfare gains can be achieved by interlinking electric power systems. A major improvement in this regard has been the implementation of flow-based market coupling (FBMC) in Central Western Europe [Réseau de transportd'électricité (RTE) et al., 2015]. However, recent assessments [Entso-E, 2018] have shown that FBMC is not yet fully understood. We contrast the FBMC domain with the feasible regions in a nodal market design based on a stylized example. Our analysis reveals the essential elements of FBMC, including its positive features. We also show that certain FBMC approximations will always affect welfare to a certain extent.
中文翻译:
基于流量的市场耦合领域-为什么我们做错了
通过将电力系统互连可以显着提高福利水平。在这方面的一个重大改进是在西欧中部实施了基于流量的市场耦合(FBMC)[Réseaudetransported'électricité(RTE)等人,2015年]。但是,最近的评估[Entso-E,2018年]显示,FBMC尚未完全被理解。我们基于一个程式化的例子,将FBMC域与节点市场设计中的可行区域进行了对比。我们的分析揭示了FBMC的基本要素,包括其积极特征。我们还表明,某些FBMC近似值始终会在一定程度上影响福利。