Our official English website, www.x-mol.net, welcomes your feedback! (Note: you will need to create a separate account there.)
CRITICAL FACTORS AND BENEFITS IN THE USE OF EARNED VALUE MANAGEMENT IN CONSTRUCTION
Brazilian Journal of Operations & Production Management Pub Date : 2020-01-01 , DOI: 10.14488/bjopm.2020.007
Joaquim Teixeira Netto , Nylvandir Liberato Fernandes De Oliveira , Andrey Pimentel Aleluia Freitas , João Alberto Neves Dos Santos

João Alberto Neves dos Santos joaoalbertoneves@gmail.com ABSTRACT Goal: The main objective of this study is to analyze the benefits and the critical success factors (CSF) to use of Earned Value Management (EVM) in the construction projects. Design / Methodology / Approach: The research methodology was quantitative approach with statistical analysis of questionnaire with 106 answered and validated using the Cronbach’s alpha and Kaiser-Meyer-Olkin. Results: The construction companies identified the benefits and CSF in the use of EVM. The observed benefits were: achieving project cost, the definition of scope and schedule, anticipating project and project communication. The observed CSF were: team training, project management maturity, top management support, the need of pre-defined procedures, and the use of appropriate software. Limitations of the investigation: The sample of research was composed exclusively of Brazilian construction managers. Practical implications: Monitoring construction projects using EVM for construction companies. Originality / Value: The EVM is widely used for project management. However, there are few studies on its use in the construction industry.

中文翻译:

在建筑中使用挣值管理的关键因素和好处

目标:本研究的主要目的是分析在建筑项目中使用挣值管理(EVM)的收益和关键成功因素(CSF)。设计/方法/方法:研究方法是定量方法,对问卷进行统计分析,使用Cronbach's alpha和Kaiser-Meyer-Olkin对106份问卷进行了回答和验证。结果:建筑公司确定了使用EVM的好处和CSF。观察到的好处是:实现项目成本,定义范围和进度,预期项目和项目沟通。观察到的CSF为:团队培训,项目管理成熟度,高层管理支持,预定义程序的需要以及适当软件的使用。调查的局限性:研究样本完全由巴西建筑经理组成。实际意义:使用EVM监视建筑公司的建筑项目。创意/价值:EVM被广泛用于项目管理。但是,关于其在建筑行业中的用途的研究很少。
更新日期:2020-01-01
down
wechat
bug