当前位置: X-MOL 学术Process Saf. Environ. Prot. › 论文详情
Our official English website, www.x-mol.net, welcomes your feedback! (Note: you will need to create a separate account there.)
Optimal load scheduling for off-grid photovoltaic installations with fixed energy requirements and intrinsic constraints
Process Safety and Environmental Protection ( IF 7.8 ) Pub Date : 2021-05-01 , DOI: 10.1016/j.psep.2020.11.011
Francisco J. Navarro-Gonzalez , Yolanda Villacampa , Miguel Ángel Pardo Picazo , M. Cortés-Molina

ABSTRACT Solar energy is one of the most promising green energy sources. On-grid photovoltaic installations supply energy to consumers as a support energy source, but in isolated areas, it comes as the unique source. The decision-maker must dimension the installation, maintaining system performance with reasonable investments. In some scenarios, the utility manager can handle the energy delivered to consumers as every subsystem can be independently connected. A strategy for scheduling the energy consumption to decrease the number of photovoltaic modules required in a standalone system is proposed here. The problem formulation corresponds to generalising a more specific problem before published. We presented a real case study being the groups of hydrants that provide water to crops in a pressurized irrigation system for energy consumption to schedule.

中文翻译:

具有固定能量需求和内在约束的离网光伏装置的最佳负载调度

摘要 太阳能是最有前途的绿色能源之一。并网光伏装置作为支持能源向消费者提供能源,但在偏远地区,它作为唯一来源。决策者必须确定安装尺寸,以合理的投资维持系统性能。在某些情况下,公用事业经理可以处理交付给消费者的能源,因为每个子系统都可以独立连接。这里提出了一种调度能耗以减少独立系统所需光伏模块数量的策略。问题公式对应于在发布之前概括一个更具体的问题。
更新日期:2021-05-01
down
wechat
bug