当前位置: X-MOL 学术Min. Metall. Explor. › 论文详情
Our official English website, www.x-mol.net, welcomes your feedback! (Note: you will need to create a separate account there.)
An Analytical Approach to Measure the Probable Overlapping of Holes Due to Scattering in Initiation System and Its Effect on Blast-Induced Ground Vibration in Surface Mines
Mining, Metallurgy & Exploration ( IF 1.9 ) Pub Date : 2020-11-10 , DOI: 10.1007/s42461-020-00350-2
Hemant Agrawal , Arvind Kumar Mishra

Rock breakage using blasting is one of the important operations of the mining industry. The delay timing decides the initiation sequence of holes in the blasts and is a crucial factor to improve the overall blast performance. Blast-induced ground vibration is an undesired yet unavoidable outcome of blasting. Peak particle velocity (PPV) is commonly used to measure the magnitude of blast-induced ground vibration. Channelization and better utilization of explosive energy delay are provided between blast holes using initiating systems. The use of different initiation systems even on the same site results in a very significant difference in the values of PPV generated. Due to scattered delay timings of pyrotechnic detonators, the scaled distance predictor equations obtained become unreliable. The error/scatter in delay timing leads to overlapping of holes and hence increases in maximum charge per delay. In this paper, an analytical approach has been discussed to measure the overlapping of holes during blasting with initiation systems having inherent cap scatter. The analytical approach will be calculating the probable overlapping of holes due to scatter in delay timing and will help blasting engineers to understand the variation in maximum charge per delay due to pyrotechnic based initiating systems. In this study, a total number of 102 blasts were conducted using different initiation systems at two different opencast coal mine and 221 corresponding blast vibrations events were recorded.

中文翻译:

一种测量起爆系统中由于散射引起的可能重叠孔及其对露天矿中爆破引起的地面振动的影响的分析方法

使用爆破破岩是采矿业的重要作业之一。延迟时间决定了爆破孔的起爆顺序,是提高爆破整体性能的关键因素。爆破引起的地面振动是爆破的一种不希望但不可避免的结果。峰值粒子速度 (PPV) 通常用于测量爆炸引起的地面振动的大小。使用起爆系统在爆破孔之间提供通道化和更好地利用爆炸能量延迟。即使在同一地点使用不同的引发系统也会导致产生的 PPV 值存在非常显着的差异。由于烟火雷管的分散延迟时间,获得的缩放距离预测方程变得不可靠。延迟时间的误差/分散会导致空穴重叠,从而增加每个延迟的最大电荷。在本文中,讨论了一种分析方法来测量爆破过程中孔的重叠,使用具有固有帽散射的起爆系统。分析方法将计算由于延迟时间的分散而导致的孔可能重叠,并将帮助爆破工程师了解由于基于烟火的启动系统导致的每次延迟的最大装药量的变化。在这项研究中,在两个不同的露天煤矿使用不同的起爆系统总共进行了 102 次爆炸,并记录了 221 次相应的爆炸振动事件。已经讨论了一种分析方法来测量爆破过程中孔的重叠,使用具有固有帽散射的起爆系统。分析方法将计算由于延迟时间的分散而导致的孔可能重叠,并将帮助爆破工程师了解由于基于烟火的启动系统导致的每次延迟的最大装药量的变化。在这项研究中,在两个不同的露天煤矿使用不同的起爆系统共进行了 102 次爆炸,并记录了 221 次相应的爆炸振动事件。已经讨论了一种分析方法来测量爆破过程中孔的重叠,使用具有固有帽散射的起爆系统。分析方法将计算由于延迟时间的分散而导致的孔可能重叠,并将帮助爆破工程师了解由于基于烟火的启动系统导致的每次延迟的最大装药量的变化。在这项研究中,在两个不同的露天煤矿使用不同的起爆系统总共进行了 102 次爆炸,并记录了 221 次相应的爆炸振动事件。分析方法将计算由于延迟时间的分散而导致的孔可能重叠,并将帮助爆破工程师了解由于基于烟火的启动系统导致的每次延迟的最大装药量的变化。在这项研究中,在两个不同的露天煤矿使用不同的起爆系统总共进行了 102 次爆炸,并记录了 221 次相应的爆炸振动事件。分析方法将计算由于延迟时间的分散而导致的孔可能重叠,并将帮助爆破工程师了解由于基于烟火的启动系统导致的每次延迟的最大装药量的变化。在这项研究中,在两个不同的露天煤矿使用不同的起爆系统共进行了 102 次爆炸,并记录了 221 次相应的爆炸振动事件。
更新日期:2020-11-10