Double shear bolted bracket moment connections, part 1: Four-bolt configuration design methodology
Journal of Constructional Steel Research ( IF 4.1 ) Pub Date : 2020-11-01 , DOI: 10.1016/j.jcsr.2020.106280
Bahram Mirzaie Abar , Mohammad Soheil Ghobadi

Abstract In this paper, a new rigid moment connection called Double Shear Bolted Brackets (DSBB) moment connection is introduced for use in Special Moment Frames (SMFs). The DSBB connection fastens each beam flange to column flange with three brackets including two internal brackets and one external bracket with pretensioned bolts. These brackets can be fabricated by casting or connecting bracket segments with welds. One of the main advantages of DSBB connection is the double shear performance of the connected bolts to the beam flange, and their less diameter of bolts compared to the other prequalified connections. Inherently, the less diameter of bolts in the DSBB connection reduces the bolt material usage and installation time of bolts. To develop the design method of the DSBB, first a precise analysis of the bracket thin-walled segments is conducted based on the yield line theory, then all applicable limit states of yield, rupture, and buckling failures subjected to corresponding actions are checked for the components of each bracket. In the following, the cyclic behavior of the connection introduced as a rigid moment connection is evaluated using high-fidelity finite element modeling. Then the study of energy dissipation is conducted on the connection's components and the beam and finally, the plastic hinge formation in the beam and the connection zone are controlled according to the plastic equivalent strain criterion. The results indicate that DSBB connection is acceptable as a fully restrained moment connection for application in SMFs and is an economical fast erection moment connection choice.

中文翻译:

双剪螺栓支架力矩连接,第 1 部分:四螺栓配置设计方法

摘要 本文介绍了一种新的刚性力矩连接,称为双剪螺栓支架(DSBB)力矩连接,用于特殊力矩框架(SMF)。DSBB 连接通过三个支架(包括两个内部支架和一个带有预紧螺栓的外部支架)将每个梁法兰紧固到柱法兰上。这些支架可以通过铸造或用焊缝连接支架段来制造。DSBB 连接的主要优点之一是连接到梁法兰的螺栓具有双重剪切性能,并且与其他预认证连接相比,它们的螺栓直径更小。从本质上讲,DSBB 连接中较小的螺栓直径减少了螺栓材料的使用和螺栓的安装时间。开发DSBB的设计方法,首先基于屈服线理论对支架薄壁管片进行精确分析,然后对每个支架的部件进行相应作用下屈服、断裂和屈曲失效的所有适用极限状态进行检查。下面,使用高保真有限元建模评估作为刚性力矩连接引入的连接的循环行为。然后对连接构件和梁进行能量耗散研究,最后根据塑性等效应变准则控制梁和连接区中塑性铰的形成。结果表明,DSBB 连接作为 SMF 中应用的完全约束力矩连接是可以接受的,并且是一种经济的快速安装力矩连接选择。