当前位置: X-MOL 学术Bull. Eng. Geol. Environ. › 论文详情
Our official English website, www.x-mol.net, welcomes your feedback! (Note: you will need to create a separate account there.)
Actual performance analysis of a double shield TBM through sedimentary and low to medium grade metamorphic rocks of Ghomrood water conveyance tunnel project (lots 3 and 4)
Bulletin of Engineering Geology and the Environment ( IF 4.2 ) Pub Date : 2020-08-19 , DOI: 10.1007/s10064-020-01947-z
Jafar Hassanpour , Yavar Firouzei , Golnaz Hajipour

In this paper, after a brief description of engineering geological properties of Ghomrood water conveyance tunnel project (lots 3 and 4 with a total length of 18 km), the actual performance of the machine during the excavation of tunnel through sedimentary and low to medium grade metamorphic rocks has been analyzed. Subsequently, using data collected during pre-construction and construction phases of the project, the relationships between rock mass properties and measured machine performance parameters have been investigated and proposed as a prediction model which can be used in future projects in which similar geological conditions are encountered. Results of analyses indicated that there are strong relationships between TBM performance and engineering geological conditions of the tunnel alignment.



中文翻译:

Ghomrood输水隧洞工程(3号和4号)中沉积和中低品位变质岩的双层盾构TBM的实际性能分析

本文在简要介绍了Ghomrood输水隧道项目的工程地质特性(3号和4号地段,总长18 km)之后,在通过沉积和中低品位的隧道开挖过程中机器的实际性能已经对变质岩进行了分析。随后,使用在项目的施工前和施工阶段收集的数据,研究了岩体特性与测得的机器性能参数之间的关系,并将其作为预测模型,可用于将来遇到类似地质条件的项目中。分析结果表明,隧道掘进机的掘进性能与工程地质条件之间存在很强的联系。

更新日期:2020-08-19
down
wechat
bug